My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-07-09_REVISION - M1984001
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1984001
>
2009-07-09_REVISION - M1984001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 5:18:40 PM
Creation date
7/13/2009 1:55:03 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1984001
IBM Index Class Name
REVISION
Doc Date
7/9/2009
Doc Name
Request for acreage reduction approval
From
DRMS
To
Parkerson Brotherss, LLC
Type & Sequence
AR1
Email Name
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Agency or organization name: DRMS <br />Permit or other job action :A R-01 Final Reclamation Cost Estimate <br />Task description : Distribute 6" of topsoil over 5 acres of Site A <br /> <br />HOURLY EQUIPMENT COST <br /> Basic machine: Cat D8R Series 11 - 8SU (200,1 Horsepower : 310 <br /> Blade type : Semi-Universal <br /> Attachment no. 1 :ROPS Cab Shiftbasis : 1 per day <br /> Attachment no. 2 :NA <br /> Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $50.32 NA <br /> Operating cost/hour : $77.13 100 <br /> Ripper op. cost/hour : $0.00 NA <br /> Operator cost/hour : $32.78 NA <br /> Total unit cost/hour : $160.22 Total fl eet cost/hour : $160.22 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 7,260 LCY factor : NA volume : 7,260 LCY <br /> <br />Source of estimated volume :6" of topsoil over 5 acres <br />Source of estimated swell factor :NA <br /> <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 100 feet Material consistency : 1.10 (Cat HB) <br />Unadjusted hourly production : 852.6 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1 shift/day) <br />Partly consolidated stockpile Spoil pile : 0.80 (fnd-rf) <br /> Push gradient : 1.22 (Cat HB) <br />Average push gradient : 10.00 % (neg) Altitude : 1.00 (Cat HB) <br />Average site altitude : 6,600 feet Material weight : 1.44 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 1,600 Ibs/LCY Net correction : 0.96 <br />Weight description <br />Top Soil Adjusted unit production : 822.45 LCY/hr <br /> Adjusted fleet production : 822.45 LCY/hr <br /> <br />JOB TIME AND COST <br />Fleet size : 1 Dozer(s) Total job time : 8.83 Hours <br />Unit cost : $0.195 /LCY Total job cost : $1,414 <br />
The URL can be used to link to this page
Your browser does not support the video tag.