My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-07-09_REVISION - M1984001
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1984001
>
2009-07-09_REVISION - M1984001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 5:18:40 PM
Creation date
7/13/2009 1:55:03 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1984001
IBM Index Class Name
REVISION
Doc Date
7/9/2009
Doc Name
Request for acreage reduction approval
From
DRMS
To
Parkerson Brotherss, LLC
Type & Sequence
AR1
Email Name
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />COST SUMMARY FORM <br />... . <br />PROJECT IDENTIFICATION <br />Date : 08-Jul-2009 Permit or job no. M-1984-001 Site : Surface Rock Pit <br />User : THM <br />State : Colorado <br />County :Mesa <br />Agency or organization name: DRMS <br />Permit or job action :AR-01 Final Reclamation Cost Estimate <br />TASK LIST (DIRECT COSTS) <br />NO. TASK DESCRIPTION FORM <br />USED FLEET <br />SIZE TASK <br />HOURS DIRECT <br />COST <br />01a -Rip and Regrade Site A Imprint Area dozer 1 35.2 $5,938 <br />02a -Distribute 6" of topsoil over 5 acres in Site A dozer 1 8.8 $1,414 <br />03a -Revegetation of 5 acres in Site A revege 1 16.0 $4,465 <br />04a -Mobilization mobilize 2 3.9 $2,101 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />SUBTOTALS: 63.9 $13,918 <br />* includes inflation factor adjustment of : NA % TOTAL DIRECT COST $13,918 <br />...... <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT- Liability insurance : 2.02 % of direct total = $281 <br />Abbreviation : none <br />Filename : M001-000 <br />Performance bond : 1.05 % of direct total = $146 <br />Job superintendent : NA* NA NA total = NA <br />Profit : 10.00 % of direct total = $1,392 <br />* not required (or eqp. operator serves as super.) <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT - <br />Financial warranty processing (legal/related costs) <br />Engineering work and/or contract/bid preparation <br />Reclamation management and/or administration <br />TOTAL O & P = S1.819 <br />CONTRACT AMOUNT (direct + O & P) _ <br />total $ NA total = <br />NA NA total = <br />% of cntr. NA total = <br />$7b,/:3/ <br />$500 <br />NA <br />$787 <br />CONTINGENCY - <br />500.00 <br />NA <br />5.00 <br />NA* <br />NA <br />total = NA <br />* contingencies accounted for at task level TOTAL INDIRECT COST = $3,106 <br />TOTAL BOND AMOUNT (direct + indirect) _ $17,024
The URL can be used to link to this page
Your browser does not support the video tag.