Laserfiche WebLink
STATE OF COLORADO <br />DIVISION OF RECLAMATION, MINING AND SAFETY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />COLORADO <br />Denver, Colorado 80203 <br />Phone: (303) 866-3567® D I V I S ION OF <br />RECLAMATION <br />FAX: (303) 832-8106 MINING <br /> <br />JUL 13 2009 SA FETY <br />July 7, 2009 D'IV*il" Of R8C10Matioe, <br />MiWng and Safety Bill Ritter, Jr. <br />Judy DeVincentis VIA FACSIMILE (970) 249-0590 and US Mail Governor <br />Western Gravel <br />Inc. Harris D. Sherman <br />, <br />3001 North Townsend Avenue Executive Director <br /> <br />Montrose, CO 81401 Ronald W. Cattany <br /> <br />Division Director <br /> <br />RE: Fifth Continuance of Formal Board Hearing,y Natural Resource Trustee <br />Reason to Believe a Violation Exists, Olathe Pit, Permit No. M-1984-108. <br />Dear Ms. DeVincentis: <br />On February 3, 2009, the Division noticed Western Gravel of a Formal Board Hearing for consideration <br />of possible violation of C.R.S. 34-32.5-117(4)(b)(1) for failure to maintain sufficient financial warranty to <br />assure the completion of reclamation, and C.R.S. 34-32.5-117(4)(c)(II.) for failure to submit a financial <br />warranty within 60 days of adjustment at the Olathe Pit. The adjustment in financial warranty was <br />warranted to assure the protection of water resources and compliance with Colorado water laws <br />governing injury to existing water rights. The hearing was scheduled for March 11 and 12, 2009. <br />Subsequently, the Office of the State Engineer (OSE) confirmed receipt of the Olathe Pit Substitute <br />Water Supply Plan (SWSP). In an effort to accommodate the review process of the OSE, the Division <br />continued the Formal Board Hearing to July 8 and 9, 2009. <br />Recent communication from the Operator indicates the review process of the Olathe Pit-SWSP nears <br />completion. Representatives of the Office of the State Engineer have confirmed such progress. <br />Therefore, the Division has continued the Formal Board Hearing to August 12 and 13, 2009. Please <br />bear in mind the Division still has reason to believe a possible violation of C.R.S. 34-32.5-117(4)(b)(1) <br />and C.R.S. 34-32.5-117(4)(c)(II) exists. <br />Therefore, a Formal Board Hearing will be held at the August 12 and 13, 2009 Board meeting for <br />consideration of a possible violation. The hearing will be held in Room 318 of 1313 Sherman Street, <br />Denver, Colorado, beginning at 9:00 a.m. on August 12t' and 13th or as soon thereafter as the matter can <br />be considered. The conditions previously stated in the Division's notice, dated February 3, 2009, remain <br />intact. However, the date of the hearing, originally scheduled for March 11 and 12, 2009, has been <br />continued to August 12 and 13, 2009. <br />Singer ?. <br />Wallace H. Erickson <br />Environmental Protection Specialist <br />cc: Sitira Pope, Secretary to the MLRB, fax (303) 832-8106 <br />Steve Shuey, Senior Environmental Protection Specialist, fax (970) 241-1516 <br />Bob Hurford, Division 4, DWR, fax (970) 249-8728 <br />Office of Office of <br />Mined Land Reclamation Denver - Grand junction - Durango Active and inactive Mines