My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-06-20_REVISION - C1981044 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981044
>
2008-06-20_REVISION - C1981044 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:33:23 PM
Creation date
7/9/2009 11:10:32 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981044
IBM Index Class Name
REVISION
Doc Date
6/20/2008
Doc Name
Memo & Cost Estimate
From
Jim Stark
To
File
Type & Sequence
RN5
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />.............................. <br />PROJECT IDENTIFICATION <br />Task #: 046 State :Colorado Permitfjob# :C-1981-044 <br />Date : 0611811008 <br />User: JRS <br />County:Moffat <br />Site : Eagle Mine Complex <br />Abbreviation : none <br />Filename : C044-046 <br />Blade type : Semi-Universal <br />Attachment no. 1 :ROPS Cab Shift basis:_ 1 per day <br />Attachment no. 2:3-shank ripper <br />Data source:- (CRG) <br />volume : 1,726 CCY factor : 1.125 volume : 1,942 LCY <br /> <br />Source of estimated volume : Permit Exhibit 18, DWG IV-43 <br />Source of estimated swell factor : Caterpillar Handbook Edition 32 <br /> <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 50 feet Material consistency : 0.90 (Cat HB) <br />Unadjusted hourly production :--Z 110.5 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility: 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (lshift/day) <br />Compacted rill or embankment Spoil pile : 1.00 (doz-oc) <br /> Push gradient : 1.00 (Cat HB) <br />Average push gradient : 0.00 % (pos) Altitude : 1.00 (Cat HB) <br />Average site altitude : 5,400 feet Material weight : 0.87 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2650 Ibs/LCY Net correction : 0.49 <br /> <br />Weight description : <br />Decomposed rock - 25% Rock, 75% Earth Adjusted unit production : 1025.87 LCY/hr <br /> Adjusted fleet production : 1,025.87 LCY/hr <br /> <br /> <br />T <br />JOB TIME '6`66i <br />Fleet size : 1 Dozer(s) Total job time : 1.89 Hours <br />Unit cost : $0.203 /LCY Total job cost : $394 <br /> <br />ip: X.XXI
The URL can be used to link to this page
Your browser does not support the video tag.