My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-06-20_REVISION - C1981044 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981044
>
2008-06-20_REVISION - C1981044 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:33:23 PM
Creation date
7/9/2009 11:10:32 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981044
IBM Index Class Name
REVISION
Doc Date
6/20/2008
Doc Name
Memo & Cost Estimate
From
Jim Stark
To
File
Type & Sequence
RN5
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action :Permit Renewal 05 <br />Task description :Regrade Pond 9-P4 <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D91? - 9SU (2005) Horsepower : 405 <br />Blade type : Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2:3-shank ripper <br /> (CRG) <br />Data source: <br /> - <br />Utilization % <br />Cost Breakdown : Ownership cost/hour : $71.49 NA <br />Operating cost/hour : $103.27 100 <br />Ripper op. cost/hour : $0.40 5 <br />Operator cost/hour : $32.78 NA <br />Total unit cost/hour : $207.94 Total fleet cost/hour : $207.94 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 101 CCY factor : 1.125 volume : 114 LCY <br />Source of estimated volume: Permit Exhibit 18, DWG IV-37 <br />Source of estimated swell factor : Caterpillar Handbook Edition 32 <br />HOURLY PRODUCTION <br />Average push distance : 50 feet <br />Unadjusted hourly production : 2,110.5 LCY/hr <br />Material consistency description <br />Compacted rill or embankment <br />Average push gradient <br />Average site altitude <br />0.00 % (pos) <br />5,400 feet <br />Material weight : 2,650 Ibs/LCY <br />Weight description : <br />Decomvosed rock - 25% Rock, 75% Earth <br />JOB TIME AND COST <br />dition Correction Factors <br />Operator skill : <br />0.75 Source <br />(avg.) <br />Material consistency : 0.90 (Cat HB) <br />Dozing method : 1.00 (gen.) <br />Visibility : 1.00 (a vg.) <br />Job efficiency : 0.83 (1 shift/day) <br />Spoil pile : 1.00 (doz-oc) <br />Push gradient : 1.00 (Cat HB) <br />Altitude : 1.00 (Cat HB) <br />Material weight : 0.87 (Cat HB) <br />Blade type : 1.00 (S/SU/U) <br />Net correction : 0.49 <br />Adjusted unit production : 1025.87 LCY/hr <br />Adjusted fleet production : 1,025.87 LCY/hr <br />Fleet size : 1 Dozer(s) Total job time : 0.11 Hours <br />Unit cost : $0.203 /LCY Total job cost : $23
The URL can be used to link to this page
Your browser does not support the video tag.