Laserfiche WebLink
Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $71.49 NA <br /> Operating cost/hour : $103.27 100 <br /> Ripper op. cost/hour : $0.40 5 <br /> Operator cost/hour : $32.78 NA <br /> Total unit cost/hour : $207.94 Total fleet cost/hour : $207.94 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 298 CCY factor : 1.125 volume : 335 LCY <br /> <br />Source of estimated volume: Permit TMT pond map date 8-28-93 <br />Source of estimated swell factor : Caterpi/lar Handbook Edition 32 <br /> <br /> <br />HOURLY PRODUCTION <br />Job Condition Correction Factors ....... _ ,. . <br />Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 50 feet Material consistency : 0.90 (Cat HB) <br />Unadjusted hourly production : 2,110.5 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1shift1day) <br />Compacted rill or embankment Spoil pile : 1.00 (doz-oc) <br /> Push gradient : 1.00 (Cat HB) <br />Average push gradient : 0.00 % (pos) Altitude : 1.00 (Cat HB) <br />Average site altitude : 5,400 feet Material weight : 0.87 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,650 Ibs/LCY Net correction : 0.49 <br />Weight description : <br />Decomposed rock - 25% Rock, 75% Earth Adjusted unit production : 1025.87 LCY/hr <br /> Adjusted fleet production : 1,025.87 LCY/hr <br /> <br />.::........:.. <br />JOB TIME AND COST <br />Fleet size : 1 Dozer(s) Total job time : 0.33 Hours <br />Unit cost : $0.203 /LCY Total job cost : $68 <br />