My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-06-20_REVISION - C1981044 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981044
>
2008-06-20_REVISION - C1981044 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:33:23 PM
Creation date
7/9/2009 11:10:32 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981044
IBM Index Class Name
REVISION
Doc Date
6/20/2008
Doc Name
Memo & Cost Estimate
From
Jim Stark
To
File
Type & Sequence
RN5
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Eagle Mine Complex C-1981-044 <br />Permit Kenewal 05 <br />PROJECT IDENTIFICATION <br /> <br /> <br />ate : <br /> <br />9 May-08 - - <br />- - <br />Permit <br />--- -- - - --- <br />t <br />C 1981-022 f Site: Elk Creek <br />-- - ---- - <br />Mine <br />User. JRS ' t :State . Colorado - - <br /> <br />-- - <br />Filename: ------ -- - - - <br />IC022-000 Coun :Delta <br />Agency <br />Name Colorado Division Of Minerals And Geology - <br />--- <br />Permit Action 2006 Midterm Review <br />I -- - --- <br /> <br />Task <br /> <br />--- <br />-. - <br />Task Description - <br />- -- <br /> <br />i i <br /> <br />-_ <br /> <br />jTASK HOURS ' <br /> <br />DIRECT COST <br />066 Regrade Main Substation <br />--- - <br />- -- <br />- <br />- <br />f <br />' <br />1.11 - <br />1 <br />192 <br />$ <br /> <br /> <br />067 <br />--- <br />Re lace To soil from Stockpile to Main Substation <br />and <br />Access Road <br />-- -- - - ---------- ---- <br />- - - <br />- <br />-- - --- <br /> <br /> <br />0.14 , <br />_ <br />----- <br />--- <br />$147 <br />-- - - - - <br /> <br />072 --- --- -- <br />Place Cover on Non-Coal Waste Disposal Area <br />15.83 <br />1$6,265 <br />073__ <br />- - ___ 1Replace Topsoil from Stockpile to Non Coal Waste Disposal Area <br />' P <br />2.14 - -- <br />$2 <br />303 <br /> ___ --- --- , <br />_ <br />077 Regrade Amoco Pipeline Pond <br />- 2.01 j$417 <br /> <br />078 <br />-- <br />- Regrade Sediment Control Ditches <br />i _ <br />21.45 _ _ _ <br />$4 <br />494 <br />079 <br />-- (Replace Topsoil from Stockpile to Amoco Pond <br /> <br />-- -- I - - <br />I --- - <br />0 2 <br />4 - - <br />? , <br />- --- -- <br />$50 <br /> - - - - -- <br />- ? <br />082 <br /> <br />- Yearly Site Maintenance <br /> <br />- - - - - ---- <br />-- - - _- - - - 40000 <br />1 <br />$40 <br />250 - - - <br />083 <br />-- - <br />Pond Cleaning <br />-- -- <br />_ _- - - - <br />- - - - - -- _ - - i - <br /> <br /> <br />. _ - <br />- - -r - - - 1 <br /> <br />r 240-.00 - -- -- <br /> <br /> <br />? , <br />- -- <br />$75,000 <br />090 <br />- (Mobilize/Demobilize Equipment for Initial Reclamation <br />-- ? -- - -- --- -- . <br />X <br />4.67 <br />12,658 <br />091 <br /> <br />- - ,Mobilize/Demobilize Equipment for Pond Removal <br /> <br />- --- -- - -- -- _ --- <br />333 -- <br />1 - <br />$1 <br />669 <br />092 <br />- Mobilize/Demobilize Equipment for Yearly Site Maintenance -- - - <br />- -- -- j 111.33 , <br />$20,939 <br />093 ;Mobilize/Demobilize Equipment for Pond Cleaning <br />- - - - __ - } i 3.33 <br />NA <br />-- Reclaim Williams Fork Strip Pit <br />--- - - <br />1 ------ <br />$192 <br />826 <br />NA Reve etate Utah Tract f _ - - - - -f , <br />$1 - - ---- <br /> <br /> <br />erect ost Total - - - <br />--- - - - <br />$2 681 7 <br />- - - - - ? - - - - -? 3,599.761 <br />INDIRECT COSTS ------- <br />Overhead and Profit <br />Liability Insurance (2.02% of Direct Costs) $54'171 <br />- - - - - <br />- --- - <br />- -- -- - <br />Performance Bond (1.05% of Direct Costs) - - - <br />- I - -- I '_- $2_8,158 <br />Job Superintendent (at $41.25/hour) - - - _ - - - - -- - l - - - --$74,245 <br />- - <br />1799.88 <br />Profit (10.00% of Direct Costs) -- - -- <br />- - -- -- <br />- -- - -- _- - ? 268,173 <br />Total Overhead and Profit f i $424,748 <br />jrs <br />Page 3 <br />6/19/2008
The URL can be used to link to this page
Your browser does not support the video tag.