Laserfiche WebLink
HOURLY PRODUCTION sheet 2 of 2 <br />Hauling Capacity : <br />) Basis : Scraper Bowl (volume) Basis : <br />Material weight : 2,650 pounds/LCY <br />Material description : <br />Decomposed rock - 25% Rock, 75% Earth <br />Rated payload : 75,000 pounds <br />Payload capacity : 28.30 LCY <br />Struck volume : 24.00 LCY <br />Heaped volume : 34.00 LCY <br />Average volume : 29.00 LCY <br />Adjusted capacity : 28.30 LCY ** <br />hourly production reflects volume per scraper pair on push-pull models <br />Cycle Time : Job Condition Corrections : Site altitude (ft.) : 5,400 <br /> Scraper Push dozer Source <br />Scraper loading time 1.00 minutes Altitude adj.: 1.000 NA (Cat HB) <br />Maneuver and spread time : 0.60 minutes Job efficiency : 0.830 NA (Cat HB) <br />' load time per scraper pair on push-pull models Net correction : 0.830 NA <br />Travel time : <br />Road condition description :Rutted dirt, little maintenance, no water, 2" tire penetration <br />Haul Route : <br />Seg. # Haul distance (feet) Grade (%) Roll. res. (%) Total res. (%) Velocity (fpm) Travel time (min.)** <br />1 650 3.00 5.00 8.00 1131 0.63 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Haul time : 0.63 minutes <br />" travel time for each segment is adjusted for acceleration/deceleration. Return time : 0.36 minutes <br />table velocities are max. attainable per total resistance shown, not average <br />Total scraper team cycle time (load + haul + maneuver and spread + return) : 2.58 minutes <br />Unadjusted unit production/hour : 1,314.38 LCY/hour *** Adjusted for job conditions : 1,090.94 LCY/hour <br />Optimal number of scrapers per push dozer : NA Selected number of scrapers : 2 scraper(s) <br />Adjusted single scraper team (unit) hourly production : 1,090.94 LCY/hour <br />Adjusted multiple scraper team (fleet) hourly production : 1,090.94 LCY/hour <br />JOB TIME AND COST <br />Fleet size : 1 Team(s) Total job time : 33.69 Hours <br />Unit cost : $0.574 /LCY Total job cost : $21,102 <br />Return route :