Laserfiche WebLink
CIRCES Cost Estimatinsat Software <br />BULLDOZER WORK <br />::.:::.................................................................................................._ .......................................................................................... <br />PROJECTIDENTIFI.CATION <br />Task #: 007 State : Colorado Permit/job# : C-1981-044 <br />Date <br />User <br />0611812008 <br />JRS <br />County :Moffat <br />Site : Eagle Mine Complex <br />Abbreviation :none <br />Filename :C044-007 <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action : Permit Renewal 05 <br />Task description : Regrade Portal No. 5 Facilities Area <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D10R - 10SU (2005) Horsepower : 570 <br />Blade type : Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2:3-shank ripper <br />Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $97.38 NA <br /> Operating cost/hour : $138.49 100 <br /> Ripper op. cost/hour : $1.51 15 <br /> Operator cost/hour : $32.78 NA <br /> Total unit cost/hour : $270.15 Total fleet cost/hour : $1,080.61 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 51,750 CCY factor : 1.125 volume : 58,219 LCY <br /> <br />Source of estimated volume :Permit Exhibit 25, Table 63, Map 26 <br />Source of estimated swell factor :Division Estimate <br /> <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 275 feet Material consistency : 0.90 (Cat HB) <br />Unadjusted hourly production : 680.0 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility: 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1shift1day) <br />Compacted fill or embankment Spoil pile : 0.80 (fnd-ro <br /> Push gradient : 0.99 (Cat HB) <br />Average push gradient : 1.00 % (pos) Altitude : 1.00 (Cat HB) <br />Average site altitude : 5,400 feet Material weight : 0.87 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,650 Ibs/LCY Net correction : 0.38 <br />Weight description : <br />Decomposed rock - 25% Rock, 75% Earth Adjusted unit production : 261.60 LCY/hr <br /> Adjusted fleet production : 1,046.38 LCY/hr <br /> <br /> <br />JOB TIME AND COST ........ ..... .:...:.;.:. <br />Fleet size : 4 Dozer(s) Total job time : 55.64 Hours <br />Unit cost : $1.033 /LCY Total job cost : $60,123 <br />