Laserfiche WebLink
McClane Canyon Mining LLC <br />Water Sampling Report <br />Date: 6/25/09 <br />Weather Conditions: Clear, 80+ degrees F. <br /> Surface Water <br />Sample <br />Point Time Flow <br />cfs pH EC <br />umhos/cm Temp (C) <br />SWA 10:10 AM 0.8 8.5 2200 16.2 <br />SW-2 9:00 AM Dry - - - <br />W-3 9:46 AM D - - - <br />W-4 7:47 AM D - - - <br />W-5 <br />I 9:00 AM Dry - - - <br />W-6- 9:50,AM- -D - <br />W-7 <br />s 9:50 AM Dry <br />- <br />- <br />- <br />SW-8 8:05 AM 0.8 8.6 2200 14.0 <br /> <br /> Ground Water <br />S PPointe Time (feet) SWL PH umhos/cm Temp (C) <br />GW-1 8:32 AM 10.7 7.2 4700 12.4 <br />GW-3 8:15 AM 36.0 7.1 4300 14.1 <br />GW-6 9:50 AM Dry-18.8' <br />GW-9 8:45 AM 26.4 7.0 9600 13.4 <br />Location of Points/Wells <br />SWA East Salt Creek above McClane under haul road bridge <br />SW-2 McClane Creek at culvert below mine <br />SW-3 Munger Creek at haul road culvert below mine <br />SW-4 East Salt Creek --2 miles downstream of SW-8 <br />SW-5 McClane Creek above mine site at culvert inlet <br />SW-6 Munger Creek below mine before north split <br />SW-7 Munger Creek above Mine <br />SW-8 East Salt Creek between Munger and McClane Creeks at bridge <br />SW-X McClane Creek at confluence with East Salt Creek <br />Second Quarter 2009 <br />Sampled by: Jim Stover <br />Meters Calibrated: Yes <br />GW-1 Alluvium of East Salt Creek about 3 Miles above McClane - TD 14.3' <br />GW-3 Alluvium of East Salt Creek just below Munger Canyon - TD 47.3' <br />GW-6 In Munger Canyon at the permitted waste rock disposal area - TD 18.8' <br />GW-9 Alluvium of East Salt Creek below proposed waste rock disposal area - TD 53.5 <br /> Feet <br />GW-1 Total Depth 14.3 <br />GW-3 Total Depth 47.3 <br />GW-6 Total Depth 18.8 Depth revised when pipe was damaged <br /> during gob pile construction. <br />GW-9 Total Depth 53.5 <br />0q.70 m <br />®®?°? Q" ES/' 4 ???r•® <br />19230 <br />F ®s®mmo® <br />&woo