D. Name, address and phone number of any other lessees,,assigns,. agents,. etc:, and briefly describe their
<br />involvement with theoperatlon, if applicable:
<br />III. PROPERTY.OR AREA
<br />(Name of claim, if applicable, and the legal land description. where the operation will be located.)
<br />MCO - Name Section . Township
<br />Santiago Lode Mining-Claim,- U. S. Survey-No. 12903 -1- S
<br />Santiago No. 1 Lode Mining Claim, U.S. Survey No. 15558 -"
<br />Santiago No. 2 Lode Mining Claim, U.S. Survey No. 14825 a / i
<br />Santiago No. 3 Lode Mining Claim, U.S. Survey No. 14069
<br />IV. DESCRIPTION OF THE OPERATION
<br />Range
<br />
<br />A. Access. Show on a map (USGS quadrangle map or a National forest map, for example) the claim boundaries, if applicable, and
<br />all access needs such as roads and trails, on and off the claim. Specify which Forest Service roads will be used, where
<br />maintenance or reconstruction is proposed, and where new construction is necessary.. For now construction, include construction
<br />specifications such as widths, grades, etc., location and size'of culverts, describe maintenance plans, and the type and size of
<br />vehicles and equipment that will use the access routes.
<br />Page 2A
<br />Access Roads #2744 are passable for transportation and equipment and are currently being used
<br />and maintained by the City of Golden for the Vidler Tunnel: Water Project 2009. Unless
<br />sloughing of road banks or wash out occur, no reclamation should be necessary. (See Page 13
<br />road photos)
<br />B. Map, Sketch or Drawing. Show location and layout of the area of operation. Identify any streams, creeks or springs if known.
<br />Show the size and kind of all..surface disturbances such as trenches,. pits, settling ponds, stream channels and run-off diversions,
<br />waste dumps, drill pads, timber disposal or clearance, etc. Include sizes, capacities, acreage, amounts, locations, materials
<br />involved, etc.
<br />All work will be underground and, with the 'exception of the drainage ditch, waste rock and
<br />rehabilitation of the 5`h Level Portal, the drainage will be 125 feet long by 1 foot deep and 18
<br />inches wide only to direct the flow of the pumped water, if needed. (See topographical map and
<br />drawings, Pages 5-6)
<br />(Ifm:orespan is needed to ftl out a block of Information, use addWonal sheets and attach form)
<br />-2-
|