Laserfiche WebLink
D. Name, address and phone number of any other lessees,,assigns,. agents,. etc:, and briefly describe their <br />involvement with theoperatlon, if applicable: <br />III. PROPERTY.OR AREA <br />(Name of claim, if applicable, and the legal land description. where the operation will be located.) <br />MCO - Name Section . Township <br />Santiago Lode Mining-Claim,- U. S. Survey-No. 12903 -1- S <br />Santiago No. 1 Lode Mining Claim, U.S. Survey No. 15558 -" <br />Santiago No. 2 Lode Mining Claim, U.S. Survey No. 14825 a / i <br />Santiago No. 3 Lode Mining Claim, U.S. Survey No. 14069 <br />IV. DESCRIPTION OF THE OPERATION <br />Range <br /> <br />A. Access. Show on a map (USGS quadrangle map or a National forest map, for example) the claim boundaries, if applicable, and <br />all access needs such as roads and trails, on and off the claim. Specify which Forest Service roads will be used, where <br />maintenance or reconstruction is proposed, and where new construction is necessary.. For now construction, include construction <br />specifications such as widths, grades, etc., location and size'of culverts, describe maintenance plans, and the type and size of <br />vehicles and equipment that will use the access routes. <br />Page 2A <br />Access Roads #2744 are passable for transportation and equipment and are currently being used <br />and maintained by the City of Golden for the Vidler Tunnel: Water Project 2009. Unless <br />sloughing of road banks or wash out occur, no reclamation should be necessary. (See Page 13 <br />road photos) <br />B. Map, Sketch or Drawing. Show location and layout of the area of operation. Identify any streams, creeks or springs if known. <br />Show the size and kind of all..surface disturbances such as trenches,. pits, settling ponds, stream channels and run-off diversions, <br />waste dumps, drill pads, timber disposal or clearance, etc. Include sizes, capacities, acreage, amounts, locations, materials <br />involved, etc. <br />All work will be underground and, with the 'exception of the drainage ditch, waste rock and <br />rehabilitation of the 5`h Level Portal, the drainage will be 125 feet long by 1 foot deep and 18 <br />inches wide only to direct the flow of the pumped water, if needed. (See topographical map and <br />drawings, Pages 5-6) <br />(Ifm:orespan is needed to ftl out a block of Information, use addWonal sheets and attach form) <br />-2-