My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-07-08_REVISION - M1980027 (4)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980027
>
2009-07-08_REVISION - M1980027 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:44:24 AM
Creation date
7/9/2009 7:46:31 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980027
IBM Index Class Name
REVISION
Doc Date
7/8/2009
Doc Name
FW increase- revised
From
DRMS
To
Bumgardner Ranches, Inc.
Type & Sequence
SI2
Email Name
PSH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />EQUIPMENT MOBILIZATION /DEMOBILIZATION <br />ROJECT IDENTIFICATION sheet 1 of 2 <br />Agency or organization name :Colorado Department Of Reclamation, Mining And Safety <br />Task # : 005 State :Colorado Permit/job # : M1980027 <br />Date :05/09/2009 County :Grand Abbreviation :none <br />User : PSH Site :Bumgardner Ranches Gravel i Filename :M027-005 <br />Permit or other job action :Revised Bond Calculation <br />Task description :Mob/Demob <br />..: <br />_. <br />Ec1i1iNME1yT TRANSPORT RIG COST Shift basis : 1 per day <br />Cost data source : CRG Dafa <br />Truck tractor description :Generic on-highway (ruck tractor, 6x4, diesel powered, 400 HP (2nd half, 2006) <br />Truck trailer description :Generic folding gooseneck, drop deck equipment trailer (25T, 50T, and 100T) <br />Available rig capacities : 0-25 Tons 26-50 Tons 51+ Tons <br />Cost Breakdown : Ownership cost/hour : $16.63 $18.37 $22.33 <br />Operating cost/hour : $44.38 $46.13 $50.07 <br />Operator cost/hour : $27.66 $27.66 $27.66 <br />Helper cost/hour : $0.00 $25.39 $25.39 <br />Total Unit Cost/hour : $88.67 $117.55 $125.45 <br />,. <br />NON-ROADABLE EQUIPMENT <br />Machine <br />Description Weight/unit <br />(Tons) Ownership <br />Cost/hr/unit Haul Rig <br />Cost/hr/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet DOT permit <br />Cost/fleet <br />-Cat D8R Series 11 - 8SU (20 52.55 $50.32 $125,45 1 $175.77 $125.45 $500.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $175.77 $125.45 $500.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.