Laserfiche WebLink
Best Management Practices <br /> <br />PRACTICE EMPLOYED AREA WHERE PRACTICE IS <br />EMPLOYED DATE OF <br />IMPLEMENTATION <br />Vegetation Management: <br />Buffer Strips Setbacks as required b DMG permit 1998 & ongoing <br />Temporary Seeding <br />Constructed Wetlands <br />Revegetate as Practicable Reclaimed areas according to DMG <br />permit 1998 & ongoing <br />Other (describe) <br />Water Management (Tem orary Structural Controls): <br />Straw Bales <br />Silt Fences <br />Detention/Holding Ponds East of concrete plant current <br />Rip Rapping <br />Site Grading Entire site current <br />Other (describe) <br />Water Management (Permanent Structural Controls): <br />Upstream Flow Diversion <br />Channel Improvements <br />Flow Storage/Detention <br />Berming Along property boundaries and <br />between roads and ponds pits current <br />Earth Dike <br />Check Dike <br />Check Dams <br />Pipe Slope Drain <br />Sediment Trap Area South of fuel island; surface depression current <br />Flow Attenuation Area <br />Infiltration Area <br />Secondary Containment for <br />Above-ground Storage Tanks Fuel island for AST's - concrete <br />containment current <br />Washout Pits Concrete lined washout east of concrete <br />plant current <br />Other (describe) <br />Other (describe) <br />35' Avenue Pit, Concrete, S Asphalt Facilities <br />Storm Water Management Plan <br />Page 10 of21