Laserfiche WebLink
TABLE 2 <br />TOTAL LAGGED STREAM DEPLETIONS FOR YEARS 2009 AND 2010 <br />ST. BARBARA SAND AND GRAVEL MINE <br />Year 2009 <br /> 1 2 3 <br /> <br /> <br /> <br /> <br />ONTH <br /> <br />TOTAL EVAPORATION <br />AND OPERATIONAL <br />WATER LOSSES <br /> <br /> <br />OTAL LAGGED <br />DEPLETIONS PBWW <br />REPLACEMENTS <br />TO ARKANSAS <br />RIVER INCLUDING <br />1%TRANSIT LOSS <br /> (ACRE-FEET) ACRE-FEE (ACRE-FEET) <br />JAN 0.82 1.73 1.75 <br />FEB 0.97 1 1.42 <br />MAR 1.34 1.56 1.58 <br />APR 2.39 1.70 1.72 <br />MAY 3.21 2.16 2.18 <br />JUN 4.11 2.53 2.56 <br />JUL 3.91 2.98 3.01 <br />AUG 3.36 3.02 3.05 <br />SEP 2.69 2.79 2.82 <br />OCT .1.94 2.61 2.64 <br />NOV 1.04 2.15 2.17 <br />DEC 0.75 1.84 1.86 <br />TOTAL 26.53 26.48 26.74 <br />NOTES: <br />(1) COL (8) - (FROM TABLE 1) <br />(2) BASED ON STREAM DEPLETION MODEL <br />(3) COL (2) + 1 % TRANSIT LOSS <br />Year 2010 <br /> 1 2 3 <br /> <br /> <br /> <br /> <br />ONTH <br /> <br />TOTAL EVAPORATION <br />AND OPERATIONAL <br />WATER LOSSES <br /> <br /> <br />OTAL LAGGED <br />DEPLETIONS PBW W <br />REPLACEMENTS <br />TO ARKANSAS <br />RIVER INCLUDING <br />1% TRANSIT LOSS <br /> (ACRE-FEET) (ACRE-FEET) (ACRE-FEET) <br />JAN 0.82 1.60 1.62 <br />FEB 0.97 1.38 1.39 <br />MAR 1.34 1.56 1.58 <br />APR 2.39 1.71 1.73 <br />MAY 3.21 2.17 2.19 <br />JUN 4.11 2.55 2.58 <br />JUL 3.91 3.00 3.03 <br />AUG 3.36 3.03 3.06 <br /> 2.69 2.80 2.83 <br /> 1.94 2.62 2.65 <br />LNOV 1.04 2.16 2.18 <br /> 0.75 1,85 7 <br /> 26.53 26.43 26.71 <br />NOTES: <br />(1) COL (8) - (FROM TABLE 1) <br />(2) BASED ON STREAM DEPLETION MODEL <br />(3) COL (2) + 1% TRANSIT LOSS <br />Martin and Woad Water ConsWtaMs, Inc.