Laserfiche WebLink
bmk <br />2009 Technical Revision Clarification <br />Snyder Quarry <br />v/M-77-210 <br />Castle Concrete Company <br /> <br />RECEIVED <br />,?-/JUL 0 2 2009 <br />Division of Reclamation, <br />J Mining and Safety <br />Overview of Permit Clarification: During the time between the submission and approval process of the <br />technical revision it became evident the reclamation specialist and blasting specialist had not communicated the <br />layout of the access road to access the new area known as AREA AP. It is the intent of this clarification to <br />rectify this miscommunication. <br />Clarification Detaih During the original submission the reclamation specialist used the original single lane <br />pedestrian road to get to the north end of the quarry where the mining will start With the construction of the <br />access road it became evident that due to the size of the haul truck and the safety requirements of the width of <br />the road along with the grade change the road needed to take a different route. <br />In the original configuration the road proceeded north, then slightly down a hill into a ravine where it turned <br />abruptly west a proceeded up a steeper hill. The new road takes a more gradual access to the top of the quarry <br />and eliminates a severe downhill 90 degree turn coming off of the quarry to the production facility when loaded. <br />The areas that would be included are noted on the enclosed map. The included areas are both well within the <br />boundaries and should produce no impact to the technical revision. <br />N <br />Castle Concrete 2008-2009 Annual Report <br />M-77-210 Snyder Quarry <br />Page 1 of 1