My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-06-26_REVISION - M1985115
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1985115
>
2009-06-26_REVISION - M1985115
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 5:38:11 PM
Creation date
7/2/2009 1:47:18 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1985115
IBM Index Class Name
REVISION
Doc Date
6/26/2009
Doc Name
Cost summary form
From
DRMS
To
Greer Pit
Type & Sequence
SR1
Email Name
KAP
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
:.................................................... -..................... ..... ...................... .......... ............................... <br />ROADABLE E ......................................................................... <br />QUIPMENT sheet 2 of 2 <br />Machine <br />Description Total <br />Cost/hour/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet <br />-Light Duty Pickup, 4x4, 314 T. $30.93 1 $30.93 $30.93 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $30.93 $30.93 <br />::::::........................................................................................................................................................................................................... <br />E ................................. <br />QUIPMENT HAUL DISTANCE and TIME <br />Nearest major city or town within project area region <br />Transportation Cycle Time : Non- Total one-way travel distance <br />Roadable Roadable Average travel speed <br />Haul time (hours) = 0.62 0.62 <br />Return time (hours) = 0.62 0.62 <br />Loading time (hours) = 0.50 NA <br />Unloading time (hours) = 0.50 NA <br />Subtotals = 2.25 1.25 <br />Total non-roadable mob/demob cost * <br />* two round trips with haul rig <br />Total roadable mob/demob cost ** <br />** one round trip, no haul rig <br />Durango <br />25.0 miles <br />40.0 mph <br />$1,192.06 <br />$38.66 <br />JOB TIME AND COST Total job time : 4.50 hours <br />Total job cost : $1,231
The URL can be used to link to this page
Your browser does not support the video tag.