My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-06-26_REVISION - M1985115
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1985115
>
2009-06-26_REVISION - M1985115
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 5:38:11 PM
Creation date
7/2/2009 1:47:18 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1985115
IBM Index Class Name
REVISION
Doc Date
6/26/2009
Doc Name
Cost summary form
From
DRMS
To
Greer Pit
Type & Sequence
SR1
Email Name
KAP
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />CIRCES Cost Estimating Software <br />COST SUMMARY FORM <br />TASK LIST (DIRECT COSTS) <br />NO. TASK DESCRIPTION FORM <br />USED FLEET <br />SIZE TASK <br />HOURS DIRECT <br />COST <br />001 -Grade highwalls dozer 1 2.2 $358 <br />002 -Regrade Pit Floor dozer 1. 0.9 $149 <br />003 -Spread Topsoil on Pit slopes dozer 1 1.1 $179 <br />005 -Revegetation revege 1 3.4 $3,907 <br />006 -Mobilize/Demoobilize mobilize 1 4.5 $1,231 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />SUBTOTALS: 12.1 $5,824 <br />includes inflation factor adjustment of NA % TOTAL DIRECT COST' _ $5,824 <br />....... ....................... ................. .:........... <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT - Liability insurance : 2.02 % of direct total = $118 <br />Performance bond : 1.05 % of direct total = $61 <br />Job superintendent : 6.10 hrs*...$/hr: $41.25 total = $251 <br />Profit : 10.00 % of direct total = $582 <br />assume net hours = 50% of task hours <br />TOTAL O & P = $1.013 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT - CONTRACT AMOUNT (direct + O & P) _ $6,837 <br />Financial warranty processing (legal/related costs) : 500.00 total $ NA total = $500 <br />Engineering work and/or contract/bid preparation : 4.25 % of cntr. NA total = $291 <br />Reclamation management and/or administration : 5.00 % of cntr. NA total = $342 <br />CONTINGENCY - NA" NA total = NA <br />contingencies accounted for at task level <br />TOTAL INDIRECT COST = $2.145 <br />TOTAL BOND AMOUNT (direct + indirect) = $7,969
The URL can be used to link to this page
Your browser does not support the video tag.