C-1981-010 PR-06 <br />ria Engineering Adequacy Review <br />02 July 2009 <br />Page <br />'lease provide a description of the benching activities proposed for the steeper side <br />slopes that exist within the Horse Gulch Fill area. <br />Response: The A.AI Horse Gulch Fill Stability Analysis report has been revised to <br />include a description of benching activities proposed for the steeper side slopes that <br />exist within the Horse Gulch Fill Area (page 26 and Figure 2 . <br />Item resolved — no further action is required. <br />2. 4.09.1 11 — Inspection — The AA1 Report on the HG Fill discusses inspection of <br />construction of that fill and the un erdr in'. but inspections are not mentioned in either the <br />K -Fit Buttress stability analysis or within the permit test. <br />Please provide specific information within the pages of the Permit that thoroughly <br />addresses the requirements of Section 4.09. 1 1 regarding inspection of ors r e ion of <br />the Horse Gulch and K-Pit Buttress Fills. <br />Response: The inspection of fills is now addressed on pages 3-40b and -c. In <br />addition, Section 5.0 Construction Inspection has been added to AAI' -Pit Buttress <br />Fill S ab ility Anaiysis. <br />Item resolved — no Lurther action is required. <br />irea <br />3. 4.09.1(14) requires that the foundation and abutments of the fill shall be stable under all <br />conditions of construction and operation. Maps have been provided which depict the <br />mining plan and post - mining topographer, and the method of construction of each fill is <br />described, e.g. dragline and/or truer dump. very little information has been provided <br />regarding the anticipated phasing (including length of time required) for the dragline <br />portion of HG Fill to be constructed, or construction of I -Pit Buttress, or construction of <br />the remainder of the HG Fill. <br />Please provide additional detail about the timeline and phasing of the construction of the <br />G Fill, in particular, including a discussion of the t bi ity of the ill under all <br />conditions of construction and operation. <br />ation. <br />Response: Section 4.4 of I "s Horse Gulch Fill Stability Analysis report has been <br />revised to include discussions of phasing of the construction of the Horse Gulch Fill <br />and fill stability during construction and operation. <br />Item resolved — no further action is required. <br />4. .9.22d requires that in constructing the underdrain, no more than 10 percent of the <br />rock may be less than 12 inches in size and no single rock may be larger than 25 percent <br />of the width of the drain. Figure 24 and the Appendix A Horse Gulch Underdrain detail <br />of the AA1 report indicate that no more than 10 percent of the rock will be less than 10 <br />inches in size. <br />