Laserfiche WebLink
West Elk Mine 2008 Annual Hydrology Report 27 <br />• <br /> <br />• <br />Table 5. Summary of the Spring and Seep Monitoring Program (Continued) <br />Springs above the B-seam in the Jumbo Mountain Area in the North Fork Draina a Basin <br />Spring CR-12 (decreed spring # 12) Lone Pine Gulch, North of 3 x Year 3 x Year Peak Flow Period ' 1993 to present <br /> NW mine panels <br />Spring G-26a Lone Pine Gulch, North of 3 x Year 3 x Year Peak Flow Period ' 1980 to present <br /> NW mine panels <br />Spring G-28a (20) Gribble Gulch, North of NW 3 x Year 3 x Year Peak Flow Period(') 1978 to present <br /> mine panels <br /> <br />Spring G-31 -Jumbo Spring No. 4 Pond Upper Gribble Gulch, Jumbo <br />Mtn. mine panels and west of <br />3 x Year <br />3 x Year <br />Peak Flow Period <br />1977 to present <br />(decreed spring #23) ) NW mine panels <br /> Upper Gribble Gulch, north o <br />Spring G-30 Jumbo Mtn. mine panels and 3 x Year 3 x Year Peak Flow Period 1977 to present <br /> west of NW mine panels <br />Spring G-25 -Jumbo Spring No. 2 Pond Lower Gribble Gulch, north o <br />Jumbo Mtn. mine panels and <br />3 x Year <br />3 x Year <br />Peak Flow Period(') <br />1977 to present <br />(decreed spring #22) west of NW mine panels <br /> <br />Spring G-35 - Jumbo Pipeline & Spring Drainage west of Gribble, 3 x Year 3 x Year Peak Flow Period " 1993 to present <br />No. 5 (decreed spring # 18) Jumbo Mtn. mine panels <br /> Drainage west of Gribble <br />Spring G-49a -Jumbo Spring and Pipeline Gulch, Jumbo Mtn. mine 3 x Year 3 x Year Peak Flow Period "' 1995 to present <br /> panels <br />Springs above the E-seam in the D Fork Draina a Basin <br />Spring J-4 M. Dry Fork, SOD Area 3 x Year 3 x Year Peak Flow Period 1981 to present <br />Deer Creek Spring Deer Creek, SOD Area 3 x Year 3 x Year Peak Flow Period 'Z 2006 to present <br />Spring WCC-24 Lower Dry Fork, SOD Area 3 x Year 3 x Year Peak Flow Period (2) 2006 to present <br />Spring J-2 Lick Creek, SOD Area 3 x Year 3 x Year Peak Flow Period 12) 2006 to present <br />Spring J-7 Poison Gulch, SOD Area 3 x Year 3 x Year Peak Flow Period (2) 2006 to present <br />') For sites with more than 5 years of data. Lab parameters include I SS, I US, Cond., pH, and re (diss & tot). <br />2) For sites with 5 or less years of data, see Table 2 <br />s> Spring E14-1 was covered by well pad construction activity in WY 2006, therefore it was not monitored in WY 2007 or subsequent years. <br />June 2009 HydroGeo, Inc.