My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-06-30_REVISION - C1981019
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2009-06-30_REVISION - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:48:21 PM
Creation date
7/1/2009 10:55:17 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Revision
Doc Date
6/30/2009
Doc Name
2nd Adequacy Review Memo
From
Marcia Talvitie
To
Jim Stark
Type & Sequence
TR76
Email Name
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLORADO <br />DIVISION OF RECLAMATION, MINING AND SAFETY <br />Department of Natural Resources <br />1313 Jneran St, Hoorn 215 <br />Denver, ColoradoCOLORADO <br />Phone; (303) C�- <br />DIY [ I IV F <br />LAM TIoN <br />FAX: (303) 832-8106 <br />MIN I J <br />SAFETY <br />Bill Ritter, Jr. <br />INTEROFFICE MEMORANDUM <br />Governor <br />Harris D. Sherman <br />Executive Director <br />Ronald W. Cattany <br />Date: 30 .dune 2009 <br />Division Director <br />Natural Resource Trustee <br />To: Jim Stark <br />6 1-?WFrom. Marcia Talvitic <br />Subject. Colowyo Mine — Permit loo, C- 1981 -01 <br />TR -7 — South Taylor Haul Road <br />2nd Adequacy Review — Engineering <br />At your request, I have reviewed Rio Tinto's 12 .dune 2009 Response to the Division.' <br />Preliminary Adequacy Review for TR-76 with T -76 w respect to my previous comments <br />transmitted to you on 23 harsh. The numbering I used in my memo to you is followed <br />in parentheses by the item number referenced in the Response. <br />1 3 Section 4.03 .1 (1)(f) requires that all haul roads be removed and the affected land <br />reclaimed in accordance with the requirements of 4.03.1(7). The TR -7 <br />application sloes not address proposed reclamation of the South Taylor Haul <br />Road. Please provide the Division with reclamation detalls for the proposed <br />Haul Road. <br />Colowyo added the following sentence regarding reclamation of the ST Haul <br />Road to the Page 4.03 -1 and Rule 4 page 2 in 'V'olume 12: `Reclamation of <br />the South Taylor Haul Road will be addressed as required by Rule 4.03.1(7) <br />and will tale place after Colowyo has determined that the road will no longer <br />be needed for operations, reclamation or monitoring." However, no details <br />have been provided regarding the reclamation sequence for the pit and haul <br />road. <br />Please provide additional information re ardrn h a proposed reclamation <br />sequence for the , rte, haul road. <br />2(4) Construction Note 13 on Map p 5C states that, ""Temporary erosion control <br />measures shall be implemented during construction to minimize sedimentation <br />and erosion until permanent control measures can be established," la. <br />Office of office of <br />Mined land Reclamation Denver • Grand Junction • Durango Active and Inactive Mines <br />
The URL can be used to link to this page
Your browser does not support the video tag.