Laserfiche WebLink
submitted to the Planning Department prior to issuance of the SUP and shall be <br />consistent with Routt County SUP approval. <br />14. All applicable standards set forth by the Colorado Department of Health and the <br />Routt County Department of Environmental Health shall be complied with. The <br />operation shall comply with all Federal, State and local laws. <br />Specific Conditions: <br />1. Sales from the gravel pit shall not exceed 850,000 tons in any twelve consecutive <br />months. <br />2. Prior to recordation of this Permit the Permittee shall execute an agreement <br />acceptable to the Routt County Attorney outlining the details of the permitee's <br />contribution of a $0.03 per ton fee for each ton hauled out of the! Milner Pit #2 for the <br />costs of maintenance, dust control or improvements to the County Road 179, the bridge <br />over the Yampa River, and County Road 178. <br />3. Facilities included as part of this gravel pit include a scale Ihouse (approximately <br />500 sf), office trailer (approximately 1000 sf) to be located near the active pit area, a <br />40'x 60' maintenance shed, fuel tanks, crusher, conveyance system and related <br />equipment. <br />4. Any proposed amendments to the Mine Land Reclamation Division permit must <br />be approved by Planning Administrator and may be cause for a review of the SUP. <br />5. Days of operation shall be Monday through Saturday. No mining, reclamation, or <br />crushing activities shall occur on Sundays or the following national holidays: Christmas, <br />Thanksgiving, New Year's Day, Fourth of July, Presidents' Day, Memorial Day, and <br />Labor Day, except as may be approved by the Planning Administrator or Board of <br />County Commissioners for emergency situations. <br />6. Hours of operation for loading and hauling shall be from 730 a.m. to 7:00 p.m. <br />Hours of operation for the crusher shall be 7:00 a.m. to 7:00 p.m. Equipment warming <br />is allowed 15 minutes prior to beginning operations in the morning. "Operation", as used <br />in this condition, shall not include the use of the office or maintenance building. <br />7. A maximum of 60 acres, 35 acres in the Existing Pit and 25 acres in the <br />Expansion Area, shall be disturbed at any time. Disturbed acreage is defined as all <br />areas not covered by water, pavement or substantially noxious weed free vegetation, <br />but does not include areas of temporary disturbance related to construction of cutoff <br />walls in advance of mining. Reclamation according to approved plans including <br />grading, topsoiling and seeding shall occur concurrently with mineral extraction in each <br />area. <br />8. Soil and vegetation shall not be stripped in excess of an area required for one <br />year of mining except as required to construct cutoff walls in advance of mining. <br />9. Operator shall submit Division of Minerals and Geology Annual Report for the Pit <br />to the Planning Department within two weeks of due date each year for compliance <br />verification. <br />10. Expansion of the pit into an area affecting the cottonwoods and willows on the <br />east side of the property shall not take place within 600 feet of the cottonwoods and <br />willows on the east side of the property until there is documented evidence that the <br />Page 2009-297 <br />May 26, 2009 <br />Routt County Board of County Commissioners' Minutes