Laserfiche WebLink
2009 Maintenance List <br />The 2nd Quarter 2009 Inspection was performed on June 22, 2009. All structures were <br />functioning as designed. <br />One (1) location requires repair. A small slump has developed east of Moffat Pond due to <br />overland flow. This area will be regraded and rocked. This repair will be made in the 2009 <br />maintenance season, along with any other repairs identified during 2009 site inspections. <br />Repair Item No. Location Work Description <br /> <br />1 East of Moffat Pond Area of slump will be graded and rocked.