My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-06-23_APPLICATION CORRESPONDENCE - C2009087
DRMS
>
Day Forward
>
Application Correspondence
>
Coal
>
C2009087
>
2009-06-23_APPLICATION CORRESPONDENCE - C2009087
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:48:05 PM
Creation date
6/24/2009 12:47:41 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2009087
IBM Index Class Name
Application Correspondence
Doc Date
6/23/2009
Doc Name
Completeness Review Memo
From
Janet Binns
To
Tom Kaldenbach
Email Name
TAK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PEABODY SAGE CREEK MINE: PERMIT APPLICATION COMPLETENES REVIEW <br />Operation plan has details of: <br />Facilities area=12 acres excavated 175 ft. deep. Producing 1,490,000 Cu.Yds. Overburden. <br />The Overburden will be used to develop a coal stockpile and facilities pad. PAP section 2.05.3 & <br />Map 2.05.3-MIA. <br />Structures; dimensions provided Table 2.05.3-T1 and in PAP 2.05.3 p. 2.05-14 through 2.05-38, <br />and maps 2.05.3-MIA and 2.05.3-M1B. <br />SCCC provided detail that will allow the Division to calculate a reclamation cost estimate, but did not <br />provide an estimate of their own. Facilities and operation description is sufficient for the Division to <br />conduct a Reclamation Cost Estimate, therefore this section is complete for the purposes of filing. <br />2.05.4(2)(c): Pre and post mining topography maps included as well as cross sections and description of the <br />regrading operations PAP section 2.05.4(2)(c). Complete. <br />(d): Soil Replacement Plan, Complete. <br />(e): Revegetation Plan; Describes seed mixes, locations, and rates, time of planting, method of planting. <br />Complete <br />(vi) Revegetation Success Standards: PAP section 2.05.4(2)(e)(vi) p. 2.05-44. <br />Compare PSCM facilities area to established reference areas, Table 2.05.4-T4. Weighted <br />averages by community type. <br />Procedures for collecting success data is included. Rule 4.15.7(2)(b) , (c), & (d), includes <br />cover, Productivity, diversity & WPD. WPD proposed =0.9 X 200 stems per acre. <br />Complete. <br />4.15: Revegetation: <br />4.15.1(1) complete <br />(2) Complete <br />(3) Maintain fences <br />(4) Complete <br />(5) Weed Control Plan. Complete. <br />4.15.2 Use of species. Complete. <br />4.15.3 Seeding & Planting. Complete. <br />4.15.4 Mulching. <br />4.15.5 Grazing. PAP p. 2.05-47. Complete <br />4.15.6 Field trials. NA <br />4.15.7(1) Success. Complete. <br />(2) Measures used to determine success. PAP section 2.05.4(2)(e)(vi). Complete. <br />(3) Reference Areas. Complete. <br />(4) Complete <br />(5)(b) Weed control plan; PAP p. 2.05-52. Complete. <br />4.15.8 Revegetation Success Criteria. Complete. <br />4.15.9 Cropland. Pre-mining land use of cropland areas not proposed to be disturbed. NA <br />4.15. 10 Previously Mined Lands: Industrial or residential PM land use. Complete. <br />4.15.11 Statistical methods for revegetation success: Complete.
The URL can be used to link to this page
Your browser does not support the video tag.