Laserfiche WebLink
FORBS : sheet 2 of 2 <br />SHRUBS AND TREES (seed) : <br />* TOTAL SEEDS / SO. FT.: 526.2 * TOTAL POUNDS PLS I ACRE : 56.00 * TOTAL SEED MIX COST / ACRE : $616.98 <br />Seed aoolication - method : Broadcast seeding [DMG contract data] TOTAL SEED APPLICATION COST / ACRE : $212.27 <br />MULCHING and MISCELLANEOUS <br />Materials item no. 1 <br />item no. 2 <br />item no. 3 <br />item no. 4 <br />DESCRIPTION (data source) UNITS / ACRE UNIT COST / UNIT COST/ACRE <br />Straw, delivered (DMG survey data) 2.00 ton $99.62 $199.24 <br /> <br /> <br /> <br />TOTAL MULCH MATERIALS COST / ACRE : $199.24 <br />Application - method no. 1 : Power mulcher (MEANS 02910 500 0350) $61.86 <br />method no. 2 : Crimping, with tractor (DMG survey data) $55.59 <br />method no. 3: <br />TOTAL MULCH APPLICATION COST I ACRE : $117.45 <br />NURSERY STOCK PLANTING TYPE and SIZE <br />COMMON NAME NO. / ACRE (planting cost data source) MATERIAL <br />COST / PLANT PLANTING <br />COST / PLANT COST / FERT. <br />PELLET TOTAL <br />COST/PLANT TOTAL <br />COST/ACRE <br />No nursery stock required <br /> <br /> <br /> <br /> <br /> <br /> <br />JOB COST No. of acres : <br />Estimated failure rate (percent) : <br />Selected replanting work items <br />TOTAL NURSERY STOCK COST I ACRE : $0.00 <br />6.84 Cost / acre : $1,145.94 INITIAL JOB COST : $7,838.22 <br />50.00% Cost / acre*: $1,145.94 RESEEDING JOB COST : $3,919.11 <br />SM <br />TOTAL JOB COST : $11,757