My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-06-23_REVISION - C1981041 (4)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981041
>
2009-06-23_REVISION - C1981041 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:48:06 PM
Creation date
6/23/2009 3:16:34 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041
IBM Index Class Name
REVISION
Doc Date
6/23/2009
Doc Name
Completeness Letter
From
DRMS
To
OSM
Type & Sequence
SL5
Email Name
MPB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLORADO <br />DIVISION OF RECLAMATION, MINING AND SAFETY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 C O L O R A D O <br />Phone: (303) 866-3567 D I V I S I O N O F <br />FAX: (303) 832-8106 RECLAMATION <br /> MINING <br /> <br /> SAFETY <br />June 23, 2009 Bill Ritter, Jr. <br /> Governor <br /> <br />James Fulton Harris D. Sherman <br /> <br />Office of Surface Mining Executive Director <br /> Ronald W. Cattany <br />Western Regional Coordinating Center Division Director <br />1999 Broadway, Suite 3320 Natural Resource Trustee <br />P.O. Box 46667 <br />Denver, CO 80201-6667 <br />Re: Roadside Portals (Permit No. C-1981-041) <br />Bond Release Application No. 5 (SL-5) <br />Dear Mr. Fulton: <br />Snowcap Coal Company, Inc. has applied for a bond release at the Roadside Portals. The bond release <br />application was found complete by this Division on June 23, 2009. Snowcap Coal Company is <br />requesting release of Phase III bond liability on 2.1 reclaimed acres of its total 3,016 acres within the <br />permit boundary at the Roadside North and South Portals Mine. The Phase III bond release is for 2.1 <br />disturbed acres that have been fully reclaimed. The specific location for the Phase III Bond Release <br />request is at the Overland Conveyor area. A surety bond in the amount of $1,646,038.00 is in place of <br />which $10, 073.00 is being requested for release. The surface ownership is Federal and private, and <br />the coal mined was Federal and private. <br />We will contact you to advise you of the Division's required bond release inspection of the site as soon <br />as it has been scheduled. A proposed decision on the application will be issued within sixty (60) days <br />of our inspection. <br />If you have questions or need additional information, please contact me. <br />Sincerely, <br />Michael P. Boulay <br />Environmental Protection Specialist <br />MPB/Ahd <br />C-S;-A3 FF9R+641 04Ra nfi-'i-nn <br />Office of Office of <br />Mined Land Reclamation Denver • Grand Junction • Durango Active and Inactive Mines
The URL can be used to link to this page
Your browser does not support the video tag.