My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-06-16_REVISION - M1978091UG
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1978091
>
2009-06-16_REVISION - M1978091UG
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:39:03 PM
Creation date
6/23/2009 10:56:02 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1978091UG
IBM Index Class Name
REVISION
Doc Date
6/16/2009
Doc Name
Bypass pipeline construction
From
Buckhorn Geotech
To
DRMS
Type & Sequence
AM3
Email Name
RCO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Oswald, Robert <br />From: Kye Abraham [abeco@comcast.net] <br />Sent: Tuesday, June 16, 2009 12:01 PM <br />To: 'Judy Kittson' <br />Cc: David_Lazorchak@blm.gov; Oswald, Robert; 'Kelly Morgan'; 'Scott Klarich' <br />Subject: FW: Bypass Pipe Golden Wonder <br />Attachments: OBSERVATION JUNE 13.pdf <br />Judy, <br />I'm not certain if the State or BLM has a specific "sign off' form to certify construction at its various <br />completion points. I'm forwarding this to both agencies and trust they will let us know. I don't think <br />CDPHE is as interested in construction certification. They will want to test the effectiveness of the <br />system through a water sampling regimen once it's completed. <br />Thanks, <br />Kye <br />From: Judy Kittson [mailto:judy@buckhorngeo.com] <br />Sent: Tuesday, June 16, 2009 10:43 AM <br />To: 'Kye Abraham' <br />Cc: Bob.OsWald@state.co.us; whinnery@lakecity.net; steve@blackcreekhydro.com <br />Subject: Bypass Pipe Golden Wonder <br />Kye: <br />I completed a site visit to Golden Wonder Mine to observe the bypass pipe installation. It looks good <br />and per the attached observation report Stan Whinnery anticipates getting the remainder of the lime <br />for the backfill this week and completing the installation by July 1st so the State should plan a visit <br />really soon if they also want to observe the installation. I have copied Bob Oswald with the State so <br />he will know the schedule, if there is anyone else who should be copied please let me know. I will <br />ask Stan for a letter confirming his schedule. Call if any questions. Please also advise if there is a set <br />format I need to use for sign off on the construction observation. <br />Judy Kittson, P.E. <br />Civil Group <br />Direct: (970) 497-8851 <br />www.buckhornoeo.com <br />y • G_11 CH <br />Civil, Structural & Geotechnical Engineers 222 South Park Ave, - Montrose. Coal 401 <br />Ph.: (870) 249=6826 • FAX: (970) 249-0945 <br />This message is confidential. If this email has been sent to you in error, please do not open any attachments Notify the sender that you have <br />erroneously received this message and delete the message and any attachments Thank you.
The URL can be used to link to this page
Your browser does not support the video tag.