My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-06-16_REVISION - M1978091UG
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1978091
>
2009-06-16_REVISION - M1978091UG
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:39:03 PM
Creation date
6/23/2009 10:56:02 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1978091UG
IBM Index Class Name
REVISION
Doc Date
6/16/2009
Doc Name
Bypass pipeline construction
From
Buckhorn Geotech
To
DRMS
Type & Sequence
AM3
Email Name
RCO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ri §MD <br />JUN 2 2 2009 M- l 9? S- 091 <br />Dives of RecWalioo, A _ <br />Mining and Safety ' <br />U-11110i A: 111:1 L, GEOTECH 0? r"" P"r?*.,-e- Cam ?trv?t?o,,? <br />Civil, Structural & Geotechnical Engineers <br />CONSTRUCTION OBSERVATION: <br />DRAINAGE BYPASS PIPE AT GOLDEN WONDER MINE FOR LKA INTERNATIONAL <br />H I NDSDALE COUNTY, COLORADO <br />June 13, 2009 OBSERVATIONS BY JUDITH D. KITTSON, P.E. <br />• Bypass pipe is under construction, existing diversion ditch is still in place and in use. <br />• 24" O.D. SDR 17 HDPE Pipe has been fused and entire length (280-feet approximately) <br />has been placed in excavated trench along the edge of the waste rock pile as proposed <br />on the design drawings. <br />• 2" tap for air release and 24" tee for additional air release observed at upper entry to <br />pipe in accordance with design. <br />• Bedding and backfill has been placed from approximately station 0+25 to 1 +00. <br />• Concrete pipe anchors have been installed on upper section per design plans. <br />• Riprap is stockpiled on site for overflow channel construction. <br />• Construction is temporarily delayed while Contractor obtains additional limestone to <br />amend bedding and backfill. Anticipate getting lime this week and project complete July <br />V', 2009 (per conservation June 14, 2009, with Stan Whinnery). <br />Upper end of new bypass <br />pipe - diversion on left still <br />active <br />•?ea <br />P,ecP T <br />?p9 <br />oU 1 6 o <br />?oF?e\c a a``??? <br />9a
The URL can be used to link to this page
Your browser does not support the video tag.