Laserfiche WebLink
6 (Form 2- Public) <br />3. Describe the estimated topsoil depth and how topsoil will be salvaged, stockpiled and redistributed for the re-establishment of <br />vegetation. Specify approximate topsoil redistribution depth: <br />No topsoil will be disturbed during prospecting operations All work wil be conducted from <br />the existing road surface and bank. <br />4. Describe how drill holes will be plugged (refer to Rule 5.4 of the Rules for required abandonment procedures): <br />All drill holes are expected to be dry holes. Drill holes will be closed by and Expandable <br />plug near the 1 st intersection of bed rock and by capping the casing that penetrates <br />unconsolidated material in the road bank. <br />5. Describe how portals, adits, shafts, ponds, excavations, or other disturbances will be reclaimed (refer to Rule 3 and Rule 5 for <br />specific reclamation performance standards). You may wish to contact the Division for closure specifications. <br />All trash will be removed from the site. <br />All equipment and support items will be removed from the site. <br />Any brush removed from the roadway will be dispersed in adjacent areas. <br />Drill cuttings will bre spread over the. road SUIfaGe at d 11WAITIUM depth of oil !-half inches.- <br />The rnud pit and any trenGhes will be baGkfilied and graded to matGh the exi ting Fe <br />6. Describe how roads will be reclaimed or returned to their pre-prospecting (or better) condition: <br />Roads will be kept free of deadfall and rocks. Existing road drainage features will be <br />maintained during the project and left equal or better than current condition. Road gradient <br />and surface disturbed for the drill site and mud pit and trenches will be reclaimed to