My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMIT FILE - 6/23/2009, 8:17:24 AM-MR1
DRMS
>
Public
>
PERMIT FILE - 6/23/2009, 8:17:24 AM-MR1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:28:38 PM
Creation date
6/23/2009 10:44:57 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2009018
IBM Index Class Name
PERMIT FILE
Doc Date
6/16/2009
Doc Name
New NOI submittal (non-confidential)
From
Fearn Engineering Services
To
DRMS
Email Name
RCO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 (Form 2- Public) <br />5. Describe proposed surface excavation or other land disturbance, including roads, pits, trenches, waste piles, drill pads and <br />collar areas of underground workings, ponds, etc <br />Existing road surface will be cleaned of rocks and debris and leveled for drill base; Existing <br />road surface will be used for staging area for drill rods and other equipment; Mud pit and/or <br />trenches will be constructed on existing road surface; rill holes will be collared in road bank <br />next to road. Existing road is un private land owned by applicant. <br />6. Proposed Disturbance (approximate) Describe the proposed drilling to be conducted, including anticipated number of holes, <br />diameter, depth, location, etc... Submit additional pages if necessary: <br />A. Drill Pads: Quantity 1 Average Width 20 (ft) Average Length 100 (ft) <br />B. Drill Holes: Quantity 3 Depth 3,500 (ft) Diameter 3.5 - 2 (in) <br />C. Mud Pits: Quantity 1 Average Width 10 (ft) Average Length 20 (ft) <br />Average Depth 2 (ft) <br />Described proposed underground work, including reopening of old workings, advancement of adits or shafts, <br />trenches, pits, cuts, rock dumps, or other types of disturbance, describe type, quantity and general dimensions: <br />D. Other Disturbances (please describe): <br />Each drill hole will be drilled and closed prior to starting the next hole. <br />E. Indicate Chemicals and Fuels used or stored on site. List type, quantity and method to store. <br />Diesel FuH - 166 yall... tank niounted with d,ifll fuel usage will be e-supplied daily. Dilling ante.d.oft, bent-ite, diffling lubft mt. M11 be mpplied as <br />F. New Road(s): Length (ft) Width (ft) <br />Significantly Upgraded Road(s) Length (ft) Width (ft) <br />Are culverts or other crossings proposed? If so, please describe: <br />No new roads will be constructed Project will utilize only existing roads for access and <br />support activities.
The URL can be used to link to this page
Your browser does not support the video tag.