Laserfiche WebLink
(Page 3) <br />MINE ID 4 OR PROSPECTING ID M'1000- 149 <br />INSPFC'TION DATE: _ & 10_'009 INSPEC FORS INI I IALS: _}?('S_ <br />The following problems (1111) and'or possible violations (PV) (and suggested corrective actions) were identified during this inspection. <br />The problems should be corrected by the dates given, or they will become possible violations. The possible violations should be <br />corrected by the dates given to reduce their severity \%hen considered by the Mined Land Reclamation Board. The inspector noted on <br />the previous page should be notified of all corrective actions taken. <br />PROBLEMS!POS_SIBLE VIOLATIONS <br />AND <br />CORRLC' I IVI•: ACTIONS <br />PBfPv REF. PROBLEMNIOLATION CORRECTIVE ACTION CORRECTIVE <br />INSP. ACTION <br />TOPIC DEADLINE <br /> 1, ".1 S Bond InsllflIllellt to Oll,Cl llhhl'!?ed 1Illlllelll;lliI% fe i !I e 111e '\I lllf ?iIL'. 1 .1 10 ? <br />BG reclamation plan due to presence of 3: 1 .dope .Ind pi- vide proof to DBMS that <br /> large highwall. this has been done bond will be adjusted <br /> otherwise through a surety increase process <br /> to be initiated 7 16 09 <br />PB'TS 11.1.9 Failure to stockpile` maintain sufficient Recover, stockpile, and maintain sufficient 730`09 <br /> topsoil for reclamation. topsoil on site to reclaim disturbed areas <br /> according to the approved reclamation plan <br /> and provide proof to DRMS that this has <br /> been done - bond will be adjusted otherwise <br /> through surety increase process <br />PB'MP 3.1.5 Failure to follow approved mining, plan. Revise mining plan via 'T'echnical Revision 8 `110'09 <br /> or Pernlit Conversion to reflect current and <br /> future prop osed mining activities. <br /> <br /> <br />