Laserfiche WebLink
III. COMMENTS -COMPLIANCE <br /> Below are comments on the inspection. The comments include discussion of observations made <br /> during the inspection. Comments also describe any enforcement actions taken during the inspection <br /> and the facts or evidence supporting the enforcement action. <br /> Revegetation <br /> • 2009 vegetation sampling was accomplished the preceding week on the reference area <br /> and the irrigated pasture. <br /> • Hay from the first cutting had been cut and windrowed on the Benson-East parcel, north of <br /> BB Road. <br /> Prime Farmland <br /> • The portion of Morgan property that is immediately west of 2700 Road and wraps around the <br /> southern side of the topsoil stockpiles appeared to have been leveled and prepared for <br /> seeding (Figure 4). <br /> The inspection concluded at 3:00 p.m. <br /> New Horizon Mine C-1981-008 08-Jun-2009 <br /> -2- <br />