Laserfiche WebLink
FACILITIES. EXCEPTIONS TO THIS LIMITATION IN ANY YEAR MAY BE <br />SPECIFICALLY AUTHORIZED IN WRITING BY THE AREA MANAGER, BUREAU OF <br />LAND MANAGEMENT. <br />Status: This stipulation requires a future submittal and remains in effect. <br />Stipulation No. 52: DRILL SITES AND ACCESS ROADS CONSTRUCTED PURSUANT TO <br />TR-44 SHALL BE LOCATED AS AUTHORIZED BY THE BUREAU OF LAND <br />MANAGEMENT TO ENSURE PROTECTION OF ARCHAEOLOGICAL RESOURCES. <br />Status: This stipulation requires a future submittal and remains in effect. <br />Stipulation No. 53: THE OPERATOR WILL PROVIDE THE DIVISION WITH A FINAL <br />RECLAMATION PLAN FOR REFUSE PILES RP-2/3/4 AND RP-5A NO LATER THAN 31 <br />JANUARY 2004. THE PLAN SHALL INCLUDE TECHNIQUES TO REDUCE THE <br />OVERLAND SHEET AND RILL FLOW, THEREBY REDUCING CONCENTRATED FLOW <br />OVER THE SURFACE OF THE PILES. <br />Status: This stipulation was satisfied and terminated on 1 September 2004. <br />Revisions to the Permit <br />Minor Revisions and Technical Revisions which have been made to the Deserado Mine permit <br />since the last renewal (RN04) are listed below. <br />Minor Revisions: <br />Revision No. Approval date Nature of revision <br /> <br />MR129 7/22/2005 New rock Dust Hole <br />MR130 5/02/2006 Drilling of Three Degas Boreholes <br />MR131 7/24/2006 Expansion of Weed Management Plan <br />MR132 9/11/2007 B-Vent Powerline Re-Routing <br />MR133 3/12/2008 Nitrogen Injection Holes and Road <br />MR134 5/08/2008 Addition of Return Shaft RS-4 and Relocation of LWB10-1 <br />MR135 7/22/2008 Relocation of Return Shaft RS-4 and LWB10-1 <br />MR136 8/15/2008 Construction of Nitrogen Injection Holes and Pipeline <br />MR137 10/18/2008 Construction of B-Vent Shaft #3 <br />MR138 11/06/2008 Modified Configuration of RS-4 and Addition of <br /> Breathable Air-hole at RDH-2 <br />MR139 12/05/2008 Addition of Breathable Air-hole at RDH-3 <br />Deserado Mine <br />15 <br />June 18, 2009