Laserfiche WebLink
(6/11/2009) DOUGLAS Ikenberry - Page 1 <br />From: <ventureresources@att.net> <br />To: Douglas Ikenberry <dikenber@smtpgate.dphe.state.co.us> <br />Date: 5/11/2009 9:45 PM <br />Doug, <br />On April 28th I delivered to your office a revised Design and Operating Report for our Hukill Gulch Solid <br />Waste Disposal facility here in Clear Creek County. I understood you were out of the office that week, and <br />I figured you probably needed some catchup time. <br />I wanted to bring you up to date on our progress. We have completed our leachate collection structure <br />and recycle system, stormwater collection/sedimentation basin, and we have successfully reclaimed (via <br />seeding and netting) the sloped faces of the same. Our facility has had the proper wastestream pH <br />monitoring/recording instrumentation installed. This week we will be installing the ground water monitoring <br />wells and we have taken a baseline water sample (prior to operations) and are waiting for the lab report. <br />I will prepare a sealed report detailing as-builts and providing more specificity upon completetion. I will <br />submit this report to your office signalling that we are ready to start impounding waste. Along with this, we <br />will submit the Financial Assurance instrument in a form of a Certificate of Deposit, as outlined in the <br />DOR. <br />I anticipate completing these items and submitting them in the coming few weeks <br />Ryan J. McHale, PE <br />VP Operations <br />Venture Resources, Inc. <br />PO Box 1974 <br />Idaho Springs, CO 80452 <br />P: (303) 619-6323 <br />F: (303) 484-6369 <br />Please visit us at www.veniureresourcesinc.com