Laserfiche WebLink
FORBS: <br />chppf 9 of 9 <br />VI 111- n1- 1 R.Co kbuuu) . <br />v1eti Jam.../JW. rl. <br />4/.J <br />- 1 OrAL POUNDS PLS / ACRE : <br />MULCHING and MISCELLANEOUS DESCRIPTION (data source <br />Materials item no. 1 :No mulch materials required <br />item no. 2: <br />item no. 3: <br />item no. 4 <br />Application -method no. 1 :No mulch application <br />method no. 2: <br />method no. 3: <br />10.00 <br />* TOTAL SEED MIX COST / ACRE : <br />TOTAL SEED APPLICATION COST / ACRE : <br />$153.44 <br />$76.78 <br />TOTAL MULCH APPLICATION COST / ACRE : $0.00 <br /> <br />NURSERY STOCK PLANTIN <br />G TYPE and SIZE <br />MATERIAL ... <br />PLANTING <br />COST/ F <br /> <br />COMMON NAME <br />NO. /ACRE <br />(planting cost data source) <br />COST / PLANT <br />COST / PLANT ERT. <br />PELLET TOTAL <br />COST / PLANT TOTAL <br />COST / ACRE <br />No nursery stock required <br /> <br /> <br /> <br /> <br /> <br /> <br />TOTAL NURSERY STOCK COST / ACRE : $0.00 MUM <br />JOB COST No. of acres : 10.00 Cost /acre $406.76 INITIAL JOB COST : $4,067.57 <br />Estimated failure rate (percent) : 25.00% Cost / acre*: $406.76 RESEEDING JOB COST : $1,016.89 <br />Selected replanting work items : F T S TOTAL JOB COST : $5,084 <br />XXX <br />TOTAL MULCH MATERIALS COST /ACRE: $0.00