Laserfiche WebLink
LAMAR INDUSTRIAL PARK <br />GRA VEL PIT <br />PERMIT # M-9987-078 <br />File Name: H:\DRAWING FILES\ENGINEERING\TOPO\Gravel Pit LIP\Grpitlip.dwg <br /> <br />Z <br />w <br />' _ <br /> <br />'AUL <br />r - -ROAD - - <br /> <br /> <br />S <br />LI 1914 72 Fr <br />N199-28490" W- - - - <br /> <br /> <br /> <br /> <br /> <br />928'00" E <br /> <br /> <br /> <br />? 00 S 89°28'00" E <br />478 31 FT <br /> <br /> <br /> <br /> <br /> <br />89°28'00" E _ <br /> <br /> <br /> <br />P <br />Nryry? <br />2 <br /> 1436.41 FT 379.36 FT <br />I <br />LAMAR INDUS] RIAL PARK GRAVLI. I'ff PRIOR YLAR <br /> NOTIFICATION <br /> I)isturfwuces to existiutc I:,i .' I .. _.. <br /> ?I,HB-2(N1Q. <br /> Reclamation on the }:a,t <br /> <br />site. Released f}um IU <br /> Land in the process of being reclaimed is designated <br /> This area will not be utilized tor future mining oper<ru, NORTH <br /> <br /> No new disturbance. arc expected to occur dunnc Ili, SCALE 1"= 250' <br />3 dear and include onh utllvtng existing suxkpiled mu?. .. Updated June, 2009 <br />b where shown un this map Should new mining rKCur in <br /> 2009-2010, it will be minimal. to extract 100 tons. <br />b <br />z Active operations been November Ist.2(X)8. <br /> Active operations ccawd Ma-, Ist 2009 <br /> Approximately 140 tans of material were utilized from <br /> excaaated and stocklid- d material in the Act e (Tierauon, <br />aoc.ao• , <br />referenced n"nine nr ;ith. LAMA <br />R INDUSTRIAL PARK <br /> <br />31 132 S 89'36'0(" E