Laserfiche WebLink
1wr <br />Battle Mountain Resources Inc. <br />San Luis Project <br />CMLRB Permit No. M-88-112 <br />May 2009 Monthly Report <br />Page 3 <br />Table 2 -May 2009 Tailing Disposal Area Piezometer Depth to Water <br />Measurements (continued) <br />Piezometer Date Depth to Water <br />feet Total Depth (ft) Volume of <br />Water ft <br />P12 5/29/09 41.03 41.71 0.68 <br />P13 5/29/09 40.95 41.34 0.39 <br />P14 5/29/09 Dry 1 41.24 0.00 <br />P15 5/29/09 Dry 1 41.10 0.00 <br />Table 3 below provides the calendar year 2009 sludge management for the San Luis site. <br />Table 3 - Water Treatment Plant Sludge Management Year to Date. <br />Date Quantity Sludge Management <br />January 2009 235 tons Sludge transferred from drying pad to tailings <br />impoundment. <br />Should you have any questions or comments, please do not hesitate to contact either myself (719) <br />379-0795 or Mr 11 Lyle (303) 324-2630. <br />i cerely, <br />lio F. Madrid <br />nvironmental Coordinator III <br />Cc: Bill Lyle <br />File