Laserfiche WebLink
CIRCES Cost Estimatina Software <br />PROJECT IDENTIFICATION <br />Task #: 145 <br />Date : 0511612006 <br />User <br />JRS <br />Permit/job# : C-1981-022 <br />Abbreviation :none <br />Filename : C022-145 <br />Agency or organization name : Colorado Division Of Minerals And Geology <br />Permit or other job action : Technical Revision 54 <br />Task description : Replace Topsoil from Stockpile to Light-Use Roads <br />HOURLY EQUIPMENT COST <br />County:Delta <br />Site : Elk Creek Mine <br />Basic machine : Cat D9R - 9SU Horsepower : 405 <br />Blade type : Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2:3-shank ripper <br />Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $56.94 NA <br /> Operating cost/hour : $104.98 100 <br /> Ripper op. cost/hour : $1.00 10 <br /> Operator cost/hour : $32.53 NA <br /> Total unit cost/hour : $195.45 Total fleet cost/hour : $195.45 <br /> <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 2,900 B CY factor : 1.250 volume: 3,625 LCY <br /> - <br />Source of estimated volume : Division Estimate <br />Source of estimated swell factor : CAT Handbook <br /> <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 150 feet Material consistency : 1.00 (Cat HB) <br />Unadjusted hourly production : 910.5 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility: 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1shift1day) <br />Consolidated stockpile Spoil pile : 0.80 (fnd-ro <br /> Push gradient : 0.79 (Cat HB) <br />Average push gradient : 10.00 % (pos) Altitude : 1.00 (Cat HB) <br />Average site altitude : 7,500 feet Material weight : 0.90 (Cat HB) <br /> Blade type : 1.00 (S/SUN) <br />Material weight : 2,550 Ibs/LCY Net correction : 0.35 <br />Weight description : <br />Earth - Dry packed Adjusted unit production : 321.65 LCY/hr <br /> Adjusted fleet production : 321.65 LCY/hr <br /> <br />.:::..:. ..... <br />JOB TIME AND COST ....... <br />Fleet size : 1 Dozer(s) Total job time : 11.27 Hours <br />Unit cost : $0.608 /LCY Total job cost : $2,203 <br /> <br />State : Colorado