Laserfiche WebLink
CIRCES Cost Estimatinq Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task #: 143 State : Colorado Permitlob# : C-1981-022 <br />Date <br />User <br />05/16/2006 <br />JRS <br />Abbreviation :none <br />Filename : C022-143 <br />Agency or organization name : Colorado Division Of Minerals And Geology <br />Permit or other job action : Technical Revision 54 <br />Task description : Regrade Light-Use Roads <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D9R - 9SU Horsepower : 405 <br />Blade type : Semi-Universal <br />Attachment no. 1 :ROPS Cab Shiftbasis : 1 per day <br />Attachment no. 2:3-shank ripper <br /> Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $56.94 NA <br /> Operating cost/hour : $104.98 100 <br /> Ripper op. cost/hour : $1.00 10 <br /> Operator cost/hour : $32.53 NA <br /> Total unit cost/hour : $195.45 Total fleet cost/hour : $195.45 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 4,400 BCY factor : 1.250 volume : 5,500 LCY <br /> <br />Source of estimated volume: Division Estimate <br />Source of estimated swell factor : CAT Handbook <br /> <br />............... .. .:. ...:.... .. <br />HOURLY PRODUCTION <br />Job Condition Correction Factors <br />Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 150 feet Material consistency : 0.90 (Cat HB) <br />Unadjusted hourly production : 910.5 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility: 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1shift1day) <br />Compacted rill or embankment Spoil pile : 0.80 (fnd-rt) <br /> Push gradient : 0.79 (Cat HB) <br />Average push gradient : 10.00 % (pos) Altitude : 1.00 (Cat HB) <br />Average site altitude : 7,500 feet Material weight : 0.87 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,650 Ibs/LCY Net correction : 0.31 <br />Weight description : <br />Decomposed rock - 25% Rock, 75% Earth Adjusted unit production : 278.56 LCY/hr <br /> Adjusted fleet production : 278.56 LCY/hr <br /> <br />JOB TIME AND COST <br />Fleet size : 1 Dozer(s) Total job time : 19.74 Hours <br />Unit cost : $0.702 /LCY Total job cost : $3,859 <br /> <br />County : Delta <br />Site : Elk Creek Mine