Laserfiche WebLink
w <br />CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />BOREHOLE DESCRIPTION SEALING ITEM / METHOD DIAMETER LENGTH QUANTITY UNIT UNIT COST TOTAL COST <br />-Bottm Plug PVC plug - 8 in. 7" Casing NA 11.00 EA $144.80 $1,592.80 <br />-Fill Holes with Cement Portland cement grout 7" Casing 19, 625 LF Z622.00 bag $8.25 $21,631.50 <br />-Remove Methane Pump Flatbed Truck, 6x4, 45K GVW NA NA 22.00 HR $105.58 $2,322.72 <br />-Borehole Marker Borehole marker NA NA 11.00 EA $3.56 $39.16 <br />-Drill Rig Time ATLAS COPCO ROC F9-11, 5. NA NA 132.00 HR $225.16 $29,720.55 <br />-Water Truck Time Water Tanker, 2, 500 Gal. NA NA 132.00 HR $41.55 $5,483.95 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />JOB COST Total Cost : $60,791