Laserfiche WebLink
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task #: 03a State :Colorado Permit/job# M--2004-084 <br />Date <br />User <br />06/09/2009 <br />THM <br />County :Delta <br />Site: Benson Brothers Pig Mesa P <br />Agency or organization name: DRMS <br />Permit or other job action : TR-01 - Final Reclamation Cost Estimate <br />Task description :Backfill wash ponds <br />www <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D9R - 9SU (2005) <br />Blade type : Semi-Universal <br />Attachment no. 1 :ROPS Cab <br />Attachment no. 2 :NA <br />Horsepower : 405 <br />Shift basis : 1 per day <br />Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $62.35 NA <br /> Operating cost/hour : $103.27 100 <br /> Ripper op. cost/hour : $0.00 NA <br /> Operator cost/hour : $32.78 NA <br /> Total unit cost/hour : $198.40 Total fl eet cost/hour : $198.40 <br /> <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 890 LCY factor : NA volume : 890 LCY <br /> <br />Source of estimated volume :30'x 50'x 8' <br />Source of estimated swell factor :NA <br /> <br />-::. <br />HOURLY PRODUCTION . <br />Job Condition Correction Factors <br />Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 65 feet Material consistency : 1.20 (Cat HB) <br />Unadjusted hourly production : 1,752.8 LCY/hr Dozing method : 1.00 _ (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1shift1day) <br />Loose stockpile Spoil pile : 0.89 (fnd-rf) <br /> Push gradient : 1.11 (Cat HB) <br />Average push gradient : 5.00 % (neg) Altitude : 1.0.0 (Cat HB) <br />Average site altitude : 5,100 feet Material weight : 0.79 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,900 Ibs/LCY Net correction : 0.53 <br />Weight description : <br />Decomposed rock - 50% Rock, 50% Earth Adjusted unit production : 926.29 LCY/hr <br /> Adjusted fleet production : 926.29 LCY/hr <br /> <br />JOB TIME AND COST <br />Fleet size : 1 Dozer(s) Total job time : 0.9,6 Hours <br />Unit cost : $0.214 /LCY Total job cost : $191 <br /> <br />Abbreviation :none <br />Filename :M084-03a