Laserfiche WebLink
PinanARI F F(31]IPMFNT sheet 2 of 2 <br />Machine <br />Description Total <br />Cost/hour/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet <br />-Water Tanker, 2,500 Gal. $44.99 1 $44.99 $44.99 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $44.99 $44.99 <br />EQUIPMENT HAUL DISTANCE and TIME <br />Nearest major city or town within project area region : Delta <br />Transportation Cycle Time : Non- Total one-way travel distance <br />Roadable Roadable Average travel speed <br />Equipment Equipment <br />Haul time (hours) = _0.11 0.11 <br />Return time (hours) = 0.11 0.11 <br />Loading time (hours) = 0.50 NA <br />Unloading time (hours) = 0.50 NA <br />Subtotals = 1.22 0.22 <br />Total non-roadable mob/demob cost' <br />` two round trips with haul rig <br />Total roadable mob/demob cost " <br />.. one round trip, no haul rig <br />5.0 miles <br />45.0 mph <br />$4,494.10 <br />$9.99 <br />JOB TIME AND COST Total job time 2.44 hours <br />Total job cost : $4,504