Laserfiche WebLink
sheet 1 of 2 <br />CIRCES Cost Estimating Software <br />SCRAPER TEAM WORK <br />PROJECT IDENTIFICATION <br />Agency or organization name : Colorado Department Of Reclamation, Mining And Safety <br />Task # : 004 State : Colorado Permit/job #:M1991035 <br />Date : 0611012009 County: Jefferson Abbreviation :none <br />User : PSH Site :Bluestone North Filename :M035-004 <br />Permit or other job action : Revised Bond Calculation <br />Task description :Spread Topsoil <br />HOURLY EQUIPMENT COST <br />Shift basis : 1 per day <br />(Equipment Description <br />Scraper work team -Scraper :Cat 637G <br />-Push dozer:NA <br />Cost Bre <br />Support equipment -Load, area :Cat D8R Series /I - 8SU (2005) <br />-Dump area :NA <br />Road maintenance -Motor grader : NA <br />-Water truck : Water Tanker, 2, 500 Gal. <br />akdown : Scraper Work Team <br />Scraper Dozer Support Equipment <br />Load area Dump area Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : scraper2 NA dozer NA NA misctruk <br />% Utilization-machine : 100 NA 50 NA NA 50 <br />-Ripper attachment : NA NA NA NA NA NA <br />Ownerhip cost/hour : $97.18 NA $50.32 NA NA $7.53 <br />Operating cost/hour : $171.23 NA $38.56 NA NA $7.72 <br />Ripper op. cost/hour : NA NA $0.00 NA NA NA <br />Operator cost/hour : $32.96 NA $32.78 NA NA $33.94 <br />Unit subtotals : $301.38 NA $121.66 NA NA $49.19 <br />Number of units : 1 0 1 0 0 1 <br />Group subtotals : Work : $301.38 Support : $121.66 Maintenance : $49.19 <br />Total work team cost/hour : $472.22 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 80,000 LCY factor : NA volume : 80,000 LCY <br />Source of quantity take-off :6" over 100 acres <br />Source of estimated swell factor :NA