My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-06-06_INSPECTION - M2009023
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M2009023
>
2009-06-06_INSPECTION - M2009023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:47:23 PM
Creation date
6/12/2009 8:14:34 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2009023
IBM Index Class Name
INSPECTION
Doc Date
6/6/2009
Doc Name
Inspection report
From
DRMS
To
Skanska USA Civil West RMD
Inspection Date
5/15/2009
Email Name
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />SCRAPER TEAM WORK <br />PROJECT IDENTIFICATION <br />Task #: <br />Date : <br />User: <br />Agency or organization name : DRMS <br />002 State : Colorado <br />0610612009 County :La Plata <br />WHE Site : Red Mesa Pit <br />sheet 1 of 2 <br />Permit or other job action :112 Application Review <br />Task description : Replace topsoil 10 inches deeD over 20 acres affected land <br />HOURLY EQUIPMENT COST <br />Cost Bn <br />Shift basis : 1 per day <br />Equipment Description <br />Scraper work team -Scraper : Cat 637G w/push-pull <br />-Push dozer: NA <br />Support equipment -Load area : Cat D8R Series ll - 8SU (2005) <br />-Dump area : Cat D8R Series ll - 8SU (2005) <br />Road maintenance -Motor grader: NA <br />-Water truck : NA <br />?akdown : Scraper Work Team <br />Scraper Dozer Support Equipment <br />Load area Dump area Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : scraper2 NA dozer dozer NA NA <br />% Utilization-machine : 100 NA 50 50 NA NA <br />-Ripper attachment : NA NA 10 10 NA NA <br />Ownerhip cost/hour : $110.37 NA $50.32 $50.32 NA NA <br />Operating cost/hour : $177.86 NA $38.56 $38.56 NA NA <br />Ripper op. cost/hour : NA NA $0.00 $0.00 NA NA <br />Operator cost/hour : $24.95 NA $32.78 $32.78 NA NA <br />Unit subtotals : $313.18 NA $121.66 $121.66 NA NA <br />Number of units : 4 0 1 1 0 0 <br />Group subtotals : Work : $1,252.71 Support : $243.31 Maintenance : $0.00 <br />Total work team cost/hour : $1,496.02 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 26,889 LCY factor : NA volume : 26,889 LCY <br />Source of quantity take-off : (20ac)(43560sf/ac)(0.83'D) 127 - 26,888.89 cy <br />Source of estimated swell factor : NA <br />Permit/job # : M-2009-023 <br />Abbreviation :none <br />Filename : M023•-002
The URL can be used to link to this page
Your browser does not support the video tag.