Laserfiche WebLink
7. The Type and Approximate Quantity of Fertilizer, Organic Material of Soil Conditioner Used <br />and Location of Use <br />None <br />8. Estimates of the Location and Number ofAcres to be Affected in the next Report Year <br />The next pit will be advanced to the west of and parallel to the active pit as shown on the 2008-09 Annual <br />Reclamation Map. Therefore, the potential disturbance for 2009-10 is not expected to exceed: <br />Active Pit Advance - 2.0 acres <br />Topsoil Removal - 2.0 acres <br />9. The Effective Date of this Information Provided Above Shall be No More than 45 Days Priot <br />to the Anniversary Date <br />For the sake of continuity, the effective date of this information is from June 1, 2008 to June 1, 2009. <br />2 <br />