My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-06-09_REVISION - C1981019
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2009-06-09_REVISION - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:47:30 PM
Creation date
6/10/2009 11:25:51 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
REVISION
Doc Date
6/9/2009
Doc Name
Response to Preliminary Adequacy Review
From
Colowyo Coal Company
To
DRMS
Type & Sequence
TR80
Email Name
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />X Colowyo Coal Company <br />r-d• 5731 State Highway 13 <br />O Meeker, CO 81641 <br />T: 970-824-1500 <br />0 5 June 2009 <br />Mr. James R. Stark <br />Environmental Protection Specialist <br />Colorado Division of Reclamation, Mining and Safety <br />Department of Natural Resources <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />RE;EIVED <br />JUN U 9 2009 <br />Division or Reclamation. <br />Mining and Safety <br />RE: Colowyo Mine's response to the Division's Preliminary Adequacy Review <br />for Technical Revision - 80. <br />Dear Mr. Stark, <br />Colowyo received the Division's preliminary adequacy comments toward TR-80 on <br />12 May 2009 and has the following comments and responses. <br />Rule 4.14 Backfilling and Grading <br />Colowyo has not provided any description of the proposed backfilling and <br />grading operations in the approved permit. Specific text needs to be added <br />to Section 4.14 describing the details of the backfilling'and grading operations <br />proposed on the updated Map 29. The description needs to include the <br />timing and the method of the backfilling and grading. Additionally, the <br />description should include a discussion of how the runoff in the Prospect <br />drainage will be managed to ensure the integrity of the Prospect Pond and <br />adherence to the requirements of Rule 4.05 and the CDPS permit, including <br />contour ditches, internal ditches, internal sumps, etc. <br />Response: Colowyo has added text to the current permit Volume 1, Section 4.14. relating <br />to the backfilling and grading operations within the East Pit which follow the plan put forth on <br />Map 29. Colowyo has attached two copies of the updated material for the Division's <br />incorporation into the permit. <br />2. On Revised Map 29, the reclamation blocks of the East Pit progress from the <br />topographic bottom of the mining area to the top of the mining areas yearly <br />from 2009 until 2013. At that point there is a small pit remaining that <br />encompasses approximately 24 acres. The map shows that there is then a <br />one year "waiting period" before reclamation commences and three years to <br />complete the final closure of this approximately 24 acre area (2015-2017). <br />Please explain this one year "waiting period" as well as the reason why the <br />final reclamation of this area will take three years. This description will also <br />need to be detailed in the text portion of the permit in Section 4.14.
The URL can be used to link to this page
Your browser does not support the video tag.