<br />X Colowyo Coal Company <br />r-d• 5731 State Highway 13 <br />O Meeker, CO 81641 <br />T: 970-824-1500 <br />0 5 June 2009 <br />Mr. James R. Stark <br />Environmental Protection Specialist <br />Colorado Division of Reclamation, Mining and Safety <br />Department of Natural Resources <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />RE;EIVED <br />JUN U 9 2009 <br />Division or Reclamation. <br />Mining and Safety <br />RE: Colowyo Mine's response to the Division's Preliminary Adequacy Review <br />for Technical Revision - 80. <br />Dear Mr. Stark, <br />Colowyo received the Division's preliminary adequacy comments toward TR-80 on <br />12 May 2009 and has the following comments and responses. <br />Rule 4.14 Backfilling and Grading <br />Colowyo has not provided any description of the proposed backfilling and <br />grading operations in the approved permit. Specific text needs to be added <br />to Section 4.14 describing the details of the backfilling'and grading operations <br />proposed on the updated Map 29. The description needs to include the <br />timing and the method of the backfilling and grading. Additionally, the <br />description should include a discussion of how the runoff in the Prospect <br />drainage will be managed to ensure the integrity of the Prospect Pond and <br />adherence to the requirements of Rule 4.05 and the CDPS permit, including <br />contour ditches, internal ditches, internal sumps, etc. <br />Response: Colowyo has added text to the current permit Volume 1, Section 4.14. relating <br />to the backfilling and grading operations within the East Pit which follow the plan put forth on <br />Map 29. Colowyo has attached two copies of the updated material for the Division's <br />incorporation into the permit. <br />2. On Revised Map 29, the reclamation blocks of the East Pit progress from the <br />topographic bottom of the mining area to the top of the mining areas yearly <br />from 2009 until 2013. At that point there is a small pit remaining that <br />encompasses approximately 24 acres. The map shows that there is then a <br />one year "waiting period" before reclamation commences and three years to <br />complete the final closure of this approximately 24 acre area (2015-2017). <br />Please explain this one year "waiting period" as well as the reason why the <br />final reclamation of this area will take three years. This description will also <br />need to be detailed in the text portion of the permit in Section 4.14.