Demolition Work <br />Page 1 of 2 <br />Project Identification <br /> Agency or organization name: Colorado Division of Reclamation, Mining and Safety <br />Task k: 53d Permitljobii: C-80-007 <br />Date: 511112009 Abbreviation: N/A <br />User: TAK Site: West Elk Mine Filename: <br />Permitting action: MR-353 Source of unit costs: CIRCES <br />Task description: Demolish and remove a/1 structures proposed in MR-353 Location adjustment: $0.92 <br /> Last unit cost update: 71112007 <br />STRUCTURE or ITEM DESCRIPTION QUANTITY UNIT CIRCES DEMO. MENU SELECTION UNIT COST TOTAL COST % LIAR. TOTAL <br /> ft ft ft If in (100%LIAB.) (ACTUAL) <br />Mine ventilation intake air heaters (MR-299) <br />Pump building 20 40 10 8,000 CF Demo/disp./exc. pit-200' push $0.21 -$1,704.00 100% ($1,704.00) <br />Concrete slab 40 20 18 44 CV Concr. pave., demo., 7-24" th., reinf. $92.00 -$4,048.00 100% ($4,048.00) <br />HDPE pipe 2700 2,700 LF Pipe, sewer/water- 12 in. diam. $5.70 -$15,390.00 100% ($15,390.00) <br />Transport sew. tankto landfill 10,0009.1 1 EA Haul to cert. Dump-9K-12Kgal. $1,050.00 -$1,050.00 100% ($1,050.00) <br />Remove 4 bath houses 4 X 2 40 10 800 CF Demo/disp./exc. pit o 1OK' haul $0.22 -$174.40 100% ($174.40) <br />Remove office 12 55 10 6,600 CF Demo/disp./exc. pit-1OK'haul $0.22 41,438.80 100% ($1,438.80) <br />Sylvester Gulch Ventilation Shaft #1 (approved MR-305) <br />Demo concrete pad for transformers 8 12 8 96 SF Demo.disp exc. pit, 8' th. - 200 ft. $2.68 -$257.28 100% ($257.28) <br />Remove transformers 2 EA Transformer removal $1,500.00 -$3,000.00 100% ($3,000.00) <br />Shaft #1 Modifications (MR-353) <br />2,500 hp fan equip. and ducting 20 40 15 12,000 CF Demo/disp./exc. pit - 1OK' haul $0.22 $2,616.00 100% $2,616.00 <br />Concrete slab 20 40 12 800 SF Demo.disp exc. pit, 12" th. - 200 ft. $4.01 $3,208.00 100% $3,208.00 <br />Footers 2 3 115 115 LF Demo/disp./exc. pit, 2X3'-200 ft. $24.08 $2,769.20 100% $2,769.20 <br />Fan motor building 16 22 24 8,448 CF Demo/disp./exc. pit - 1OK' haul $0.22 $1,841.66 100% $1,841.66 <br />Concrete slab 18 22 12 352 SF Demo.disp exc. pit, 12" lh. - 200 ft. $4.01 $1,411.52 100% $1,411.52 <br />Footers 100 100 LF Demo/disp./exc. pit, 2X3'- 200 fl. $24.08 $2,408.00 100% $2,408.00 <br />Fan lubrication unit building 12 12 10 1,440 CF Demo/disp,/exc. pit- IOK haul $0.22 $313.92 100% $313.92 <br />Concrete slab 12 12 12 144 SF Demo.disp exc. pit, 12'th.-200 ft. $4.01 $577.44 100% $577.44 <br />Footers 67 67 LF Demo/disp./exc. pit, 2'X3'- 200 fl. $24.08 $1,613.36 100% $1,613.36 <br />Fan MCC building 12 16 12 2,304 CF Demo/disp./exc. pit- 1OK' haul $0.22 $502.27 100% $502.27 <br />Concrete slab 12 16 12 192 SF Demo.disp exc. pit, 12' th.-200 ft. $4.01 $769.92 100% $769.92 <br />Footers 81 81 LF Demo/disp./exc. pit, 2'X3'- 200 ft. $24.08 $1,950.48 100% $1,950.48 <br />Remove transformers 2 EA Transformerremoval $1,500.00 $3,000.00 100% $3,000.00 <br />Transformer pad 12 16 12 192 SF Demo.disp ex, pit, 12" th. - 200 ft. $4.01 $769.92 100% $769.92 <br />Footers 81 81 LF Demo/disp./exc, pit, 2'X3'-200 ft. $24.08 $1,950.48 100% $1,950.48 <br />Shaft #1 heater building 20 10 10 2,000 CF Demo/disp./exc. pit - IOK'haul $0.22 $436.00 100% $436.00 <br />Equipment <br />Concrete slab 20 20 6 400 SF Demo.disp exc. pit, 6" th. - 200 ft. $2.01 $804.00 100% $804.00 <br />Footers 20 10 12 12 LF Demo/disp./exc. pit, 2'X3'- 200 ft. $24.08 $288.96 100% $288.96 <br />Buried HDPE pipe 20 8 20 LF Pipe, CMP - 8 in. diem. $1.62 $32.40 100% $32.40 <br />Shaft 92 Modifications (MR-353) <br />Shaft #2 heater building 20 20 10 4,000 CF Demo/disp./exc. pit - 1 OK' haul 0.2 $872.00 100% $872.00 <br />Concrete slab 20 20 6 400 SF Demo.disp exc. pit, 6' th.-200 ft. $2.01 $804.00 100% $804.00 <br />Footers 12 12 LF Demo/disp./exc. pit, 2'X3'-200 ft. 24.1 $288.96 100% $288.96 <br />Buried HDPE pipe 60 8 60 LF Pipe, CMP - 8 in. diem. 1.6 $97.20 100% $97.20 <br />Nitrogen Supply Facility (MR-353) <br />Building 36 72 12 31,882 CF Demo/disp./exc. pit - 1OK' haul 0.2 $6,950.19 100% $6,950.19 <br />Concrete slab 36 72 12 2,592 SF Demo.disp exc. pit, 12" th. - 200 ft. 4.0 $10,393.92 100% $10,393.92 <br />Footers 268 268 LF Demo/disp./exc. pit, 2'X3'-200 ft. 24.1 $6,453.44 100% $6,453.44 <br />Buried aluminum pipe 60 6 60 LF Pipe, CMP - 8 in. diam. $1.62 $97.20 100% $97.20 <br />Total for this page before location adjustment $26,157.96 <br />Location adjustment: 92.32% Total for this page after location adjustment $24,149.03