My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-06-05_REVISION - C1981022 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981022
>
2009-06-05_REVISION - C1981022 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:47:21 PM
Creation date
6/10/2009 11:25:21 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981022
IBM Index Class Name
REVISION
Doc Date
6/5/2009
Doc Name
Preliminary Adequacy Review
From
DRMS
To
Oxbow Mining
Type & Sequence
TR63
Email Name
MLT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT IDENTIFICATION <br />Task # : 214 <br />Date : 06/0412009 <br />User : JRS <br />Agency or organization name: Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action : Technical Revision 63 <br />Task description: Replace Topsoil from Stockpile to 23 Drill Pads <br />HOURLY EQUIPMENT COST <br /> Basic machine : Cat D9R - 9SU (2005) Horsepower : 405 <br /> Blade type : Semi-Universal <br /> Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br /> Attachment no. 2 :3-shank ripper <br /> Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $71.49 NA <br /> Operating cost/hour : $103.27 100 <br /> Ripper op. cost/hour : .$0.00 0 <br /> Operator cost/hour : $32.78 1 NA <br /> Total unit cost/hour : $207.53 Total fleet cost/hour : $207.53 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 16,000 BCY factor : 1.250 volume : 20,000 LCY <br /> <br />Source of estimated volume : Division Estimate <br />Source of estimated swell factor : CAT Handbook <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 100 feet Material consistency : 1.00 (Cat HB) <br />Unadjusted hourly production : 1,243.2 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibili : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (lshift/day) <br />Consolidated stockpile Spoil pile : <br />0.80 (fnd-o <br /> _ <br /> Push gradient : 0.90 (Cat HB) <br />Average push gradient : 5.00 % (pos) Altitude : 0.95 (Cat HB) <br />Average site altitude : 8,000 feet Material weight : 0.90 (Cat HB) <br /> <br />I Blade type : 1.00 (S/SU/U) <br />Material weight : 2,550 Ibs/LCY Net correction : 0.39 <br />Weight description <br />Earth - Dry packed Adjusted unit production : 479.16 L CY/hr <br /> Adjusted fleet production : 479.16 L CY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozer(s) Total job time : 41.74 Hours <br />Unit cost : $0.433 /LCY Total job cost : $8,662 <br /> <br />CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />State : Colorado <br />County : Delta _ <br />Site : Elk Creek Mine <br />Permit/job# :C-1981-022 <br />Abbreviation :none <br />Filename :C022-214
The URL can be used to link to this page
Your browser does not support the video tag.