My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-06-08_REVISION - M1997032 (25)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1997032
>
2009-06-08_REVISION - M1997032 (25)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:20:25 PM
Creation date
6/10/2009 9:27:02 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1997032
IBM Index Class Name
REVISION
Doc Date
6/8/2009
Doc Name
EPP (AM-01) Attachment E,F,G,H,I, and J (part 7)
From
Denison Mines
To
DRMS
Type & Sequence
AM1
Email Name
RCO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
132
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5.2. Exclusive Use Statement <br />The following exclusive use statement <br />This shipment of uranium ore is beinj <br />Accordingly, the contents of this shipn <br />at the White Mesa Mill, absent any unl <br />at the Mill. The transportation co <br />uranium ore transport until such time <br />interior and exterior of the trailer and <br />unrestricted use. At such time that t: <br />markings related to the radioactive n <br />conveyance trailer. <br />be printed onto the shipping papers: <br />shipped as an exclusive (sole) use shipment. <br />nt must be loaded at the Mine and unloaded <br />ading or additional loading prior to delivery <br />veyance trailer must be utilized only for <br />that Mill personnel conduct a survey of the <br />letermine that the trailer can be released for <br />trailer is released for unrestricted use, all <br />iterial shipment must be removed from the <br />5.3. Certification <br />The Mine owner or operator shall cE <br />accordance with the applicable DOT <br />shipping papers: <br />that the uranium ore is offered for transportation in <br />ations by printing the following certification on the <br />This is to certify that the above-named materials are properly classified, described, <br />packaged, marked and labeled, and are in proper condition for transportation according to <br />the applicable regulations of the Department of Transportation. <br />This certification must be legibly signed by an employee of the Mine operator or owner. <br />6. Transportation Requirements <br />6.1. <br />The trailers must be kept closed at all times, when containing uranium ore and when empty, by <br />use of a tarpaulin or other suitable mech nism, other than loading and unloading (see Section <br />8.3.1(c) below). <br />6.2. Transportation Route <br />The Transportation Contractor shall advise DUSA of the route to be taken from the Mine to the <br />Mill. It should be noted, however, that shipments of uranium ore are not a "highway route <br />controlled quantity" within the meaning of49 CFR 403 and the applicable provisions of Title 49. <br />6.3. <br />As required by 49 CFR 177.800, all ship <br />without unnecessary delay, from and in( <br />uranium ore until its final unloading at the <br />of uranium ore to the Mill must be transported <br />the time of commencement of loading of the <br />0 <br />• <br />• <br />July 5, 2007 6 Rev 0
The URL can be used to link to this page
Your browser does not support the video tag.