Laserfiche WebLink
DRAINAGE CRITERIA MANUAL (V. 3) CONSTRUCTION BEST MANAGEMENT PRACTICES <br />DD <br />TEMPORARY DIVERSION DIKE <br />• <br />Definition <br />A temporary ridge of compacted soil located at the top, midslope, or vase of a disturbed <br />area. <br />Purposes <br />1. To divert storm runoff from higher drainage areas away from unprotected slopes to a <br />permanent channel or temporary channel diversion. <br />2. To divert sediment-laden runoff from the midslope of a disturbed area to a temporary <br />slope drain. <br />3. To divert sediment4aden runoff from the base of a disturbed area to a sediment trapping <br />facility. <br />From: Virginia Soil and Water Conservation Commission, 1985 <br />Figure C-9-Temporary Diversion Dike <br /> <br />C-36 9-1-99 <br />Urban Drainage and Flood Control District