My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-06-08_REVISION - M1997032 (22)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1997032
>
2009-06-08_REVISION - M1997032 (22)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:20:26 PM
Creation date
6/10/2009 8:51:50 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1997032
IBM Index Class Name
REVISION
Doc Date
6/8/2009
Doc Name
EPP (AM-01) Attachment B,C & D (part 5)
From
Denison Mines
To
DRMS
Type & Sequence
AM1
Email Name
RCO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COR-040000 Stormwater Management Plan <br />i 4. STORMWATER MANAGEMENT CONTROLS (COR-040000, §I.B.4) <br />a) SWMP Administrator (COR-040000, §I.B.4.a): . . <br />The Van 4 Shaft has a Stormwater Pollution Prevention Team (SWPPT) to ensure that the <br />SWMP is implemented and maintained in accordance with good engineering and <br />management practices. The team is responsible for the development, implementation, <br />maintenance, and revisions to the SWMP. The SWPPT leader will also be the SWMP <br />Administrator. <br />• <br />Leader Phone: Res onsibilities <br />Christy Woodward (303) 389-4136 Coordinate all stages of plan <br />Environmental Coordinator developmen4 implementation, <br /> evaluation, and monitoring, <br /> Coordinate employee training <br /> program; Keep all records and <br /> ensure reports are submitted. <br />Members... . _ Phone "Res' onsibilities <br />Philip Buck, (303) 628-7798 Signatory authority. <br />Vice President of Mining <br />Danny Flannery, Cell. (435) 681-0121 Implement SWMP elements; <br />Mine Compliance Technician djlannery@denisonmines.com Conduct inspections, Note any <br /> process changes; Coordinate with <br /> SWPPT Leader regarding Plan <br /> revisions; Spill Response <br /> Coordinator. <br />Jim Fisher, (970) 677-2702 Note any process changes; Oversee <br />Mine Manager Cell: (970) 739-6994 good housekeeping practices; <br /> Implement the preventative <br /> maintenance program. <br />Group Activities Implement the SWMP elements; <br /> Choose stormwater management <br /> options. <br />b) Identification of Potential Pollutant Sources and Best Management Practices (COR- <br />040000, §I.B.4.b): <br />The following potential pollutant sources and activities have been evaluated for their ability <br />to contribute pollutants to stormwater discharges. If the potential exists at the site, the <br />stormwater diversion, materials handling and spill prevention, sediment and erosion <br />prevention, and other pollution prevention best management practices (BMPs) used to <br />control that source are described. The locations of specific structural BMPs are shown on the <br />site map (Figure 3). The installation, implementation and maintenance specifications for <br />possible erosion and sediment control BMPs are identified in Appendix B. <br />Van 4 Shaft SWMP 5 Denison Mines (USA) Corp.
The URL can be used to link to this page
Your browser does not support the video tag.